首页> 外文会议>AREMA annual conference >COMPREHENSIVE ENVIRONMENTAL MANAGEMENT OF LIGHT RAIL AND COMMUTER RAIL PROJECTS IN THE PUGET SOUND REGION
【24h】

COMPREHENSIVE ENVIRONMENTAL MANAGEMENT OF LIGHT RAIL AND COMMUTER RAIL PROJECTS IN THE PUGET SOUND REGION

机译:普吉特声音地区轻轨和通勤铁路项目的综合环境管理

获取原文

摘要

The Central Puget Sound Regional Transit Authority (Sound Transit) operates high-capacity transit systems consisting of commuter (heavy) rail, light rail, and buses in the greater Seattle metropolitan area. The commuter rail system consists of 82 track miles and 12 stations, extending from Lakewood south of Tacoma to Everett north of Seattle, on BNSF trackage between Tacoma and Everett. The light-rail system currently consists of 16 track miles and 13 stations, and will be expanded to 55 miles and 33 stations to ultimately serve the area from Federal Way south of Seattle to Lynnwood north of Seattle. As each component of the Sound Transit system has been conceived and planned, detailed and comprehensive Environmental Impact Statements (EISs) have been prepared to meet requirements of the National Environmental Policy Act (NEPA) and the State of Washington Environmental Policy Act (SEPA). Sound Transit prepares these EISs in concert with other stakeholder agencies including the Federal Transit Administration, the Washington State Department of Transportation, and the Federal Railroad Administration. Sound Transit has successfully applied a comprehensive environmental management strategy that combines environmental documentation and review at the project planning and development stage with ongoing environmental compliance through the design and operation phases of each project.
机译:中央普吉特海湾地区交通管理局(Sound Transit)在大西雅图市区运营高容量的交通系统,包括通勤(重)铁路,轻轨和公共汽车。通勤铁路系统由塔科马和埃弗里特之间的BNSF轨道组成,从塔科马以南的莱克伍德一直延伸到西雅图以北的埃弗里特,共有82个轨道英里和12个车站。轻轨系统目前包括16个轨道英里和13个车站,并将扩展到55英里和33个车站,以最终服务于从西雅图以南的Federal Way到西雅图以北的Lynnwood区域。由于已经设计并计划了声音传输系统的每个组成部分,因此准备了详细而全面的环境影响声明(EIS),以满足《国家环境政策法》(NEPA)和《华盛顿州环境政策法》(SEPA)的要求。 Sound Transit与其他利益相关者机构(包括联邦运输管理局,华盛顿州交通运输部和联邦铁路管理局)共同准备这些EIS。 Sound Transit已成功应用了全面的环境管理策略,该策略将环境文档和项目规划与开发阶段的审核与在每个项目的设计和运营阶段的持续环境合规性相结合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号