首页> 外文会议>China International conference on electricity distribution >A measurement and verification method for energy savings of power line transformation project
【24h】

A measurement and verification method for energy savings of power line transformation project

机译:电力线变换项目节能的测量与验证方法

获取原文
获取外文期刊封面目录资料

摘要

Power line transformation projects, such as increasing diameter of lines, decreasing length of lines and boosting voltage level, are very common in power grid corporations. Besides meeting transmission capacity needs, these projects generate loss energy savings. Based on International Performance Measurement and Verification Protocol of efficiency valuation organization, this paper d is cusses a measurement and verification method for energy savings that generates from power line transformation projects, and gives details on how to measure parameters and calculate energy savings. The proposed method considers changes of operation situation after transformation, then a method by means of modifying baseline to solve transmission capacity varying are given in order to verify energy savings more objectively. Finally, uncertainty of the method is simply analyzed, as well as some points which might improve performance of the method further are described.
机译:电力线路转换项目,诸如线路直径的增加,线路减小和升压电压电平,在电网公司中非常普遍。除了满足传输容量需求外,这些项目还产生损失节能。基于国际绩效测量和效率估值组织的验证协议,本文是对从电源线变换项目产生的节能的测量和验证方法,并提供有关如何测量参数并计算节能的详细信息。所提出的方法考虑转换后的操作情况的变化,然后通过修改基线以解决传输容量而改变的方法,以便更客观地验证节能。最后,简单地分析了该方法的不确定性,并且还描述了可以进一步改善方法的性能的一些点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号