首页> 外文会议>International Commission on Irrigation and Drainage;International congress on irrigation and drainage >AN INTEGRATED APPROACH FOR FLOOD MANAGEMENT: A CASE STUDY ON NILWALA RIVER BASIN
【24h】

AN INTEGRATED APPROACH FOR FLOOD MANAGEMENT: A CASE STUDY ON NILWALA RIVER BASIN

机译:洪水管理的综合方法:以尼瓦尔河河流域为例

获取原文

摘要

Flooding has been one of the most costly disasters in terms of both property damage andhuman casualties in Sri Lanka. Being the Nilwala a major fl ooding rivers in the country ,NilwalaGanaga Flood Management Project has been initiated to protect the area from frequent fl oodevents. Although it was planned to implement in 3 stages, the project has not been continuedfor third stage. At the third stage of the project , it was planned to take fl ood mitigationmeasures for protecting Matara city. This study is done to study the validity of river trainingproposal by way of improving river water fl ow by removing the elevated river bed to a suitableprofi le for a river section of 1.5 km from sea mouth.HEC-RAS river routing software was used.The results of the analysis shows that the Matara city is under threat of fl ooding even for 10year return period fl ood. With the river bed excavation, city is well protected against the fl oodof 10-50 return periods.
机译:从财产损失和财产损失两方面来看,洪灾一直是代价最高的灾难之一。 斯里兰卡的人员伤亡。尼尔瓦拉(Nilwala)是尼尔瓦拉(Nilwala)在该国的主要洪水河 开展了Ganaga洪水管理项目,以保护该地区免遭频繁的洪水袭击 事件。尽管计划分三个阶段实施,但该项目没有继续进行 第三阶段在项目的第三阶段,计划采取缓解洪水的措施 保护马塔拉市的措施。这项研究是为了研究河道训练的有效性 通过去除高架河床以改善河水流量的建议 对于距海口1.5公里的河段,使用了HEC-RAS河道导航软件。 分析结果表明,即使有10年,马塔拉市也面临着洪水威胁 年回报期。随着河床的发掘,城市受到了良好的防洪保护 10-50个退货期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号