首页> 外文会议>Offshore Technology Conference >Mars B Development - Well Challenges Solutions - An Evolution of Traditional Well, Rig and Facility Design
【24h】

Mars B Development - Well Challenges Solutions - An Evolution of Traditional Well, Rig and Facility Design

机译:火星B的开发-钻井挑战与解决方案-传统钻井,钻机和设施设计的演变

获取原文

摘要

The Mars-B project is Shell’s sixth GOM TLP development and demonstrates Shell’s commitment toGOM. The Mars-B project is aiming to unlock resources over the next 50 years through the deploymentof a new 24 slot TLP structure (Olympus TLP) and additional subsea infrastructure for the WestBoreas/South Deimos fields. The Olympus DVA rig is a novel platform drilling rig designed specificallyto meet the execution requirements of complex Olympus DVA well designs. The well design andassociated equipment must accommodate the 50 year design life, the longest design life of a TLP inShell’s history.This is the first development to incorporate post-Katrina environmental design loads and newregulatory design requirements. Project challenges include numerous technical challenges pertaining towell designs for 24 DVA wells targeting over 50 horizons spanning 10, 500 ft TVD to approximately 25,000 ft TVD encompassing both highly depleted brown field and deeper virgin pressure formations.The Olympus DVA well trajectories range from near vertical to high angle extended reach both throughsediments and through salt penetrations. Rig and surface facilities must be designed to address multiplechallenges present to ensure well and facility integrity, reservoir isolation and desired well constructionobjectives are met. This requires successful development and deployment of novel technologies and worldclass systems. The design requirements have resulted in an evolution of traditional well designs which inturn drives novel rig and surface facilities requirements.A high level overview of the design challenges and the resulting surface equipment requirements willbe discussed. This includes rig equipment requirements to meet the specified execution directives, thedevelopment of an innovative drilling riser concept, added systems optimization to increase safety andoverall execution efficiency.
机译:Mars-B项目是Shell的第六次GOM TLP开发,并展示了壳牌的承诺 GOM。 MARS-B项目旨在通过部署在未来50年内解锁资源 新的24个SLOT TLP结构(OLYMPUS TLP)和西部的其他海底基础设施 Boreas / South Deimos领域。奥林巴斯DVA钻机是一种专门设计的新型平台钻机 满足复杂奥林巴斯DVA井设计的执行要求。井设计和 相关设备必须适应50年的设计生活,是TLP的最长的设计生活 壳牌的历史。 这是第一次融入Katrina环境设计负荷和新的发展 监管设计要求。项目挑战包括众多技术挑战 适用于24张DVA井的设计,瞄准超过50个跨越10,500英尺的TVD到大约25的地平线, 000 FT TVD包括高度耗尽的棕色田间和更深的初始压力地层。 Olympus DVA井轨迹范围从近垂直到高角度延伸到达 沉积物和盐渗透。钻机和表面设施必须设计用于解决多个 提出挑战,以确保良好,设施完整,水库隔离和所需井建筑 目标是满足的。这需要成功的开发和部署新颖的技术和世界 类系统。设计要求导致传统井设计的演变 转动驱动器新颖的钻机和表面设施要求。 高级概述设计挑战和所产生的表面设备要求 讨论。这包括钻机设备要求,以满足指定的执行指令, 开发创新钻探提升机概念,增加了系统优化,以提高安全性和 总体执行效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号