首页> 外文会议>Association of State Dam Safety Officials annual conference >The ABCs of ACBs - What Have We Learned, 12 Years Later Armoring Embankment Dams, Levees and Spillways with ACBs
【24h】

The ABCs of ACBs - What Have We Learned, 12 Years Later Armoring Embankment Dams, Levees and Spillways with ACBs

机译:ACB的ABC-我们学到了什么,12年后用ACB加固堤坝,堤坝和溢洪道

获取原文

摘要

Over the past 23 years numerous embankment dams and earth-cut spillways in the United States have been armored with Articulating Concrete Blocks (ACBs) to provide overtopping protection and to extend the life of the structures. With the current focus on evaluating and rehabilitating dams throughout the United States to pass increased design flows, the use of this construction technology has become popular. As a result, some ACB manufacturers have made significant investments in research and development of their concrete block systems to evaluate and improve their performance for use on embankment dams and earth-cut spillways, provide design data for designers, and develop more economical embankment armoring solutions. In addition to established ACB manufacturers, researchers from the USDA, Department of the Interior Bureau of Reclamation and the U.S. Army Corps of Engineers have designed, tested, and patented ACB systems and details for use on embankment dams, spillways and channels. In 2001, the primary author presented a paper titled: The ABCs of ACBs - An Assessment of Articulating Concrete Blocks for Embankment Overtopping Protection [Schweiger, 2001]. This paper provides a brief history of the use of ACBs in the United States which included a summary of findings from research and laboratory testing of various ACB systems and summarized the status of ASTM standards being developed to address the manufacture, testing, design, and installation of ACBs for armoring embankment dams and spillways. At that time, only 25 dams had been armored using ACBs for overtopping protection. Because of the infrequency of the design events, none of these dams had experienced an overtopping event. Since that time, there have been many changes in ACB armoring technology with new ACB manufacturers entering the market with new products, additional full scale physical modeling performed for a wider range of flow conditions, and new and improved design details have been developed. Several dams and spillways armored with ACBs have been overtopped and performed satisfactorily with overtopping flow depths and velocities approaching 4 feet and 30 feet per second, respectively. Over the same period, at least one known ACB overtopping application has failed. Much has been learned about what works and what does not work. The purpose of this paper is to provide an update on important developments in the use of ACBs for armoring embankment dams and spillways, and to share performance information from actual ACB dam armoring projects that have experienced overtopping flows.
机译:在过去的23年中,美国许多堤防大坝和土方溢洪道已用铰接式混凝土砌块(ACB)进行装甲,以提供抗倾覆保护并延长建筑物的使用寿命。当前,为了在美国各地评估和修复大坝以通过更多的设计流程,该建筑技术的使用已变得越来越流行。因此,一些ACB制造商已在其混凝土砌块系统的研发方面进行了大量投资,以评估和改善其在堤坝和土方溢洪道上使用的性能,为设计人员提供设计数据,并开发更经济的堤防装甲解决方案。除了已建立的ACB制造商之外,美国农业部,内陆垦殖局和美国陆军工程兵团的研究人员还设计,测试了ACB系统并为其申请了专利,并在堤坝,溢洪道和航道上使用了详细信息。 2001年,主要作者发表了一篇题为:ACBs的ABC-铰接式混凝土砌块对路堤防超车保护的评估[Schweiger,2001]。本文提供了在美国使用ACB的简短历史,其中包括对各种ACB系统的研究和实验室测试得出的结论摘要,并概述了为解决制造,测试,设计和安装而开发的ASTM标准的现状装甲堤坝和溢洪道的ACB。当时,只有25座水坝使用ACB进行装甲,以提供超车保护。由于设计事件的频率不高,因此这些大坝都没有经历过超车事件。从那时起,ACB铠装技术发生了许多变化,新的ACB制造商以新产品进入市场,针对更广泛的流动条件进行了额外的全尺寸物理建模,并开发了新的改进的设计细节。数个装有ACB的水坝和溢洪道已经超车并令人满意,其超车流量和速度分别达到每秒4英尺和30英尺。在同一时间段内,至少有一个已知的ACB超越应用程序已失败。人们已经学到了很多关于什么有效和什么无效的知识。本文的目的是提供有关在堤防堤和溢洪道上使用ACB的重要进展的最新信息,并共享经历过超流量的实际ACB大坝装甲项目的性能信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号