首页> 外文会议>Conference on ISA automation week >Route 2H Implications on IEC 61511
【24h】

Route 2H Implications on IEC 61511

机译:IEC 61511对IEC 61511的影响

获取原文

摘要

1. New definition for "Safe Failures", made standard more precise and abuse resistant. 2. Route 2_H should not be "propagated" to new reviews of IEC 61511, as it will create confusion. PIU concept is sound enough. 3. Some users are moving steadily to a policy of supporting their field instrumentation selection based on solid field data, collected within their organization. These users are showing willingness to share experiences for the collective good in associations such as the Instrument Reliability Network (IRN) at Texas A&M (MKOPSC) or NAMUR 4. New philosophies are being discussed for new field instruments development for safety rated applications, with limited diagnostics but very well know failure modes (Type A or Simple Type B instruments with say, more than 60% automatic diagnostic coverage factor).
机译:1.“安全故障”的新定义,使标准更精确和滥用抗性。 2.第2次_H不应“传播”到IEC 61511的新审查,因为它会产生混乱。 piu概念很好。 3.一些用户正在稳步发展,以支持基于其组织内的实地数据的实地仪器选择的策略。这些用户展示愿意在德克萨斯州A&M(MKOPSC)或Namur等协会中分享集体良好的经验4.正在为安全额定应用的新现场仪器开发讨论了新的哲学,有限诊断但非常了解失败模式(键入A或简单的B型仪器,例如,超过60%的自动诊断覆盖系数)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号