Review of PSA studies is very important. Slow review processes may however result in PSA studies being not up to date, not reflecting the unit as built and not constituting a living PSA. Each PSA study (PSA model and PSA documentation) at Forsmark Nuclear Power Plant goes through a complete update every two years. The update covers new plant data, increased scope of the PSA, plant modifications, changed operating procedures, increased level of detail, etcetera. This implies that the PSA model is updated as well as most of the PSA documentation and its appendices, a total of several hundred documents. All of this is then subjected to a number of review steps: review by the PSA team, primary safety review, independent safety review and occasionally regulatory review by the Swedish Radiation Safety Authority (SSM). Several challenges and problems have been identified regarding the PSA review processes at Forsmark Nuclear Power Plant, largely related to the large amount of calendar time used when reviewing the updated PSA studies. To increase the performance of the PSA review processes at Forsmark Nuclear Power Plant a number of changes to the processes have been implemented. In the coming years more changes are likely to be implemented as a result of benchmarking activities as well as own work refining the processes. This paper aims at describing the current situation, challenges and problems, on-going changes to the review processes and benchmarking activities.
机译:评估PSA研究非常重要。但是,缓慢的审核过程可能会导致PSA研究不是最新的,没有反映出已建成的单元,也没有构成有效的PSA。 Forsmark核电厂的每项PSA研究(PSA模型和PSA文档)每两年都要进行一次完整的更新。更新内容包括新的工厂数据,PSA范围扩大,工厂修改,更改的操作程序,详细程度提高等。这意味着PSA模型以及大多数PSA文档及其附录(总共数百个文档)已更新。然后,所有这一切都要经历许多审核步骤:由PSA团队进行审核,一次安全审核,独立安全审核以及瑞典辐射安全局(SSM)偶尔进行的法规审核。对于福斯马克核电厂的PSA评审过程,已经确定了一些挑战和问题,这主要与评审更新的PSA研究所用的大量日历时间有关。为了提高Forsmark核电厂PSA审核流程的性能,已对流程进行了许多更改。在未来几年,由于基准测试活动以及改进流程的自身工作,很可能会实施更多的更改。本文旨在描述当前的状况,挑战和问题,审查流程和基准测试活动的不断变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号