首页> 外文会议>AREMA annual conference >Improving Track Conditions for Amtrak Flow: BNSF Railway - Devils Lake, ND Track Raise and Embankment Widening Project
【24h】

Improving Track Conditions for Amtrak Flow: BNSF Railway - Devils Lake, ND Track Raise and Embankment Widening Project

机译:改善美铁流量的轨道条件:BNSF铁路-魔鬼湖,北达科他州轨道提升和路堤拓宽项目

获取原文

摘要

Burlington Northern Santa Fe Railway (BNSF) has partnered with Amtrak and the State of North Dakota to raise BNSF's existing Devils Lake Subdivision Main Line track to prevent ongoing flooding in the area from shutting down the track and making it impassable for the two Amtrak trains that pass across the stretch of track every day. During periods of high water at Devils Lake, the existing track structure becomes inundated and Amtrak is forced to reroute its trains en route from Seattle, WA to Chicago, IL. This detour adds costly mileage and time to the trip.
机译:伯灵顿北部圣达菲铁路(BNSF)与Amtrak和北达科他州合作,提高了BNSF现有的Devils Lake Subdivision Main Line轨道,以防止该地区正在进行的洪水关闭轨道,并使两列Amtrak火车无法通行每天穿过那条路。在魔鬼湖水位高的时期,现有的轨道结构被淹没,美铁被迫将其列车从华盛顿州西雅图市运送到伊利诺伊州芝加哥市。绕行会增加旅途的成本和时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号