Initial System Integrity Assessment for Safety: Methods and NGOps-4 Results

机译:初始系统完整性安全评估:方法和NGOps-4结果

获取原文

摘要

This paper describes a novel method for assessing the safety-related integrity of complex systems and associated cost risk during concept development. This Initial System Integrity Assessment (ISIA) and cost estimation process assesses program susceptibility to prescribed vulnerabilities, identifies mitigations for them, and costs those mitigations, providing a cost risk estimate for the programs, based on the initial vulnerability assessment. The methodology was developed concurrently with its application to the implementable architecture defined by the Joint Planning and Development Office as NextGen Operational level four. NGOps-4 is a future (beyond 2025) complex system concept intended to increase significantly the capacity of the air transportation system. Performance improvements supporting increased capacity often increase the levels of safety criticality that must be accounted for in business case analyses for NextGen architectures, like NGOps-4. Subject matter experts qualitatively identify and assess the vulnerabilities and identify cost categories affected by mitigations. These two inputs drive valuable program and portfolio management artifacts at each stage of the ISIA process, including experiential vulnerabilities, justified susceptibility assessments, recommended mitigations, mitigation cost factors, and program cost risk early in a program's lifecycle. ISIA artifacts can serve as inputs to later lifecycle program and portfolio assessments and act as the basis for ensuring risk retirement or mitigation. This initial ISIA application considered safety-related cost risk; however, the ISIA process can determine other program performance metrics such as schedule risk.
机译:本文介绍了一种在概念开发过程中评估复杂系统的安全相关完整性和相关成本风险的新颖方法。此初始系统完整性评估(ISIA)和成本估算过程会评估程序对指定漏洞的敏感性,为它们确定缓解措施,并对这些缓解措施进行成本计算,并根据初始漏洞评估为这些程序提供成本风险估计。该方法是与联合计划和开发办公室定义为NextGen运营级别4的可实施体系结构同时开发的。 NGOps-4是未来(超过2025年)的复杂系统概念,旨在显着提高航空运输系统的容量。支持增加容量的性能改进通常会提高安全关键级别,在针对NGenps-4之类的NextGen架构的业务案例分析中必须考虑这些关键级别。主题专家从质量上确定和评估漏洞,并确定受缓解影响的成本类别。这两个输入会在ISIA流程的每个阶段推动有价值的计划和项目组合管理工件,包括体验漏洞,合理的敏感性评估,建议的缓解措施,缓解成本因素以及项目生命周期早期的项目成本风险。 ISIA工件可以用作以后的生命周期计划和资产组合评估的输入,并且可以作为确保风险消除或缓解的基础。最初的ISIA申请考虑了与安全相关的成本风险;但是,ISIA流程可以确定其他计划绩效指标,例如进度风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号