【24h】

AN EFFICIENT RETROFIT PLANNING WORKFLOW

机译:高效的维修计划工作流程

获取原文

摘要

Ship operators are facing strict environmental requirements such as exhaust emission limitations. Often major technological modifications of the vessel are needed to assure economic and ecologic operations. Such retrofitting projects pose new challenges for the ship sub-system suppliers. Designing modified equipment is hardly possible without information of the as-built status of the ship. Generally ship owners are not capable of providing accurate 3D models without the assistance of service companies. A common approach to generate 3D models is to use laser scanning technology. However the reverse engineering process to derive 3D models from point clouds is time and labour consuming. This paper describes an approach for a more efficient tender preparation process for retrofit scenarios in the shipbuilding industry. The focus is on a new method to record the as-built situation and to generate 3D models automatically by using low-cost technology. The approach leads to cost and time savings.
机译:船舶运营商面临着严格的环境要求,例如废气排放限制。通常,需要对船舶进行重大技术改造以确保经济和生态运营。这样的改造项目对船舶子系统供应商提出了新的挑战。没有船的建成状态信息,几乎不可能设计改造设备。通常,如果没有服务公司的帮助,船东将无法提供准确的3D模型。生成3D模型的常用方法是使用激光扫描技术。但是,从点云派生3D模型的逆向工程过程既费时又费力。本文介绍了一种用于造船业翻新方案的更有效的投标准备过程的方法。重点是一种新方法,该方法可以记录建成状况并使用低成本技术自动生成3D模型。该方法可以节省成本和时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号