Starting in early 2010 Carollo Engineers Inc. was retained by the Weber Basin Water Conservancy District staff to assess the condition of the Weber and Davis Aqueducts. The two aqueducts consist of 26 miles of 21 to 84-inch pipelines constructed in the early 1950's. As part of the investigation, the team utilized various technologies and manned entry to observed five percent of the joints in the Davis and Weber Aqueducts. Upon completion of the detailed investigations, it was determined that 23 percent of the joints observed needed repair or rehabilitation. If 23 percent of the joints in the entire aqueduct need to be rehabilitated, then approximately 1,900 joints are in need of repair. This paper covers the joint condition assessment and resulting innovative approach developed to demonstrate a cost effective joint rehabilitation design. This innovative approach was subsequently installed on 229 joints on the 60-inch reinforced concrete pressure pipe (RCPP) Davis Aqueduct.
机译:从2010年初开始,韦伯盆地水利保护区工作人员聘请了卡罗洛工程师公司来评估韦伯和戴维斯渡槽的状况。两条输水管道由1950年代初期建造的26英里长的21至84英寸管道组成。作为调查的一部分,该团队利用了多种技术并进行了人工操作,以观察戴维斯和韦伯渡槽中5%的接头。完成详细调查后,确定观察到的关节中有23%需要修复或康复。如果需要修复整个渡槽中23%的接缝,则需要修复大约1,900个接缝。本文介绍了关节状况评估和开发的创新方法,以证明具有成本效益的关节康复设计。此创新方法随后安装在60英寸钢筋混凝土压力管(RCPP)戴维斯渡槽的229个接缝上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号