City of Casper, WY Phase II North Platte Sanitary Sewer Condition Assessment and Rehabilitation Analysis

机译:怀俄明州卡斯珀市二期北普拉特卫生污水管道状况评估和修复分析

获取原文

摘要

The City of Casper operates an extensive wastewater conveyance system that includes the NorthPlatte Sanitary Sewer Interceptor (NPSSI). The NPSSI is a 30-year-old, 47,000-foot-long pipeline ranging indiameter from 24 to 54 inches which is constructed of unlined reinforced concrete pipe. Concerns regardinghydrogen sulfide corrosion prompted the City to undertake a risk-based condition assessment of this interceptor.The City and CH2M HILL developed a cost-saving tiered approach to assessing the NPSSI’s current condition. Thefirst phase of the study involved top-side camera inspections and was presented at the 2011 No-Dig (City of Casper,Wyoming’s Approach to Assessing a Large Diameter Sewer Interceptor). In the Phase II study, CCTV assessmentwas conducted of only the most-corroded pipeline segments as determined in the previous field work. Following theassessment phase, the risk levels and remaining service life of the alignment were determined, segment-by-segment,using CH2M HILL's SCREAM™ software from inspection information collected using the National Association ofSewer Service Companies' Pipeline Assessment Certification Program (PACP). Based on the data analysis, pipelinerehabilitation was prioritized for the various segments of the NPSSI. A corrosion control analysis was alsoperformed to determine the feasibility of implementing a corrosion control program to extend the service life forpipeline segments which did not warrant immediate rehabilitation.This paper will illustrate the results of a cost-saving, multi-faceted field investigation and planning study to manageand extend the remaining service life of this critical City asset and will highlight the field investigation approach andfinal recommendations for minimization of capital expense.
机译:卡斯珀市运营着广泛的废水输送系统,其中包括北部 普拉特卫生污水管道拦截器(NPSSI)。 NPSSI是一条已有30年历史,长达47,000英尺长的管道, 直径从24到54英寸,由无衬砌的钢筋混凝土管制成。有关的担忧 硫化氢腐蚀促使纽约市对该拦截器进行了基于风险的状态评估。 纽约市和西图集团(H2M)HILL开发了一种节省成本的分层方法来评估NPSSI的当前状况。这 研究的第一阶段涉及对顶部摄像头的检查,并在2011年No-Dig(卡斯珀市, 怀俄明州评估大直径下水道拦截器的方法)。在第二阶段研究中,CCTV评估 如先前的现场工作所确定的,仅对腐蚀最严重的管道段进行了评估。继 评估阶段,逐段确定路线的风险水平和剩余使用寿命, 在使用美国国家协会收集的检查信息中使用CH2M HILL的SCREAM™软件 下水道服务公司的管道评估认证计划(PACP)。基于数据分析,流水线 NPSSI的各个部分都将修复工作列为优先事项。还进行了腐蚀控制分析 进行以确定实施腐蚀控制程序以延长使用寿命的可行性 不需要立即恢复的管线部分。 本文将说明节省成本,多方面的现场调查和规划研究以管理的结果 并延长该重要城市资产的剩余使用寿命,并将重点介绍实地调查方法和 最小化资本支出的最终建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号