The Roncador P-52 Oil Export System - Hybrid Riser at a 1800m Water Depth

机译:Roncador P-52石油出口系统 - 杂交提升管在1800米的水深

获取原文

摘要

The PDET (Oil Flow Master Plan) project consists of the P-52 oil export system, an 18in oil export pipeline and a Free Standing Hybrid Riser (FSHR) connecting the P-52 floating production unit to the fixed platform PRA-1, both located in the Campos Basin, offshore Brazil. The base case for the export system comprises a vertical riser and an export pipeline. The FSHR consists of a vertical steel pipe tensioned by a near surface Buoyancy Can with a flexible jumper connecting the top of the riser and the FPU. The foundation is a drilled and grouted pile. The oil export pipeline is 56km long, going from 1800m water depth at the P-52 location to 100m water depth at PRA-1. The installation was finalized on October 2007. This paper describes the studies carried out to confirm the concept feasibility for such application and explains the main features of the design that takes best advantage of local practices and Petrobras capabilities. Initially a MODU was considered for the deployment of the FSHR system. However, as an outcome of the bid process, a pipelay and construction vessel would be utilized instead, for installing the system. Moreover, the subsea equipment and derivations would be designed considering a new engineering conception of independent and retrievable modules connected at the base, named In Line Structures, therefore precluding the need of a certain number of PLETs and rigid jumper installations, thus optimizing the operation. Some of the engineering analyses performed for the design development, for both installation and in-place conditions, are described in this text. The fatigue damage due to Vortex Induced Vibration proved to be an important driver for the Hybrid Riser design. Vortex Induced Motions of the Buoyancy Can were also a significant source of fatigue damage to the system. The rigid base jumper, connecting the riser base to the pipeline is another special component of the system, and a brief explanation of the design issues is provided. Key issues such as crossing design and thermo-mechanical analysis are addressed as well as the development of mitigation solutions to overcome the thermal effects on the pipeline.
机译:PDET(石油流量计划)项目由P-52石油出口系统,18英寸出口管道和一个自由站立混合立管(FSHR)连接到固定平台PRA-1的P-52浮动生产单元位于巴西海上坎波斯盆地。出口系统的基本情况包括垂直提升管和出口管道。 FSHR由近近表面浮力张紧的垂直钢管组成,柔性跳线连接立管和FPU的顶部。该基础是钻孔和灌浆桩。石油出口管道长56千米,在P-52位置为1800米的水深,在PRA-1的水深100米。安装已于2007年10月完成本文介绍进行了确认这样的应用概念的可行性研究,并解释说,需要的地方实践和巴西国家石油公司能力最大的优势设计的主要特点。最初,考虑了Modu用于部署FSHR系统。然而,作为投标过程的结果,将使用管道和施工船舶,以便安装系统。此外,将考虑在底座上的独立和可检索模块的新工程概念进行设计和推导,因此排除了一定数量的机器和刚性跳线装置的需要,从而优化了操作。在本文中描述了用于安装和就地条件的设计开发的一些工程分析。由于涡旋诱导的振动引起的疲劳损坏被证明是混合动力提升机设计的重要驾驶员。涡旋诱导的浮力运动的动作也可以是对系统疲劳损坏的重要来源。将提升管基座连接到管道的刚性基础跳线是系统的另一个特殊组成部分,并提供了对设计问题的简要说明。交叉设计和热机械分析等关键问题以及缓解解决方案的开发,以克服管道的热效应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号