A nuclear power plant's Technical Specifications (TS) define the limits and conditions for plant operation. The original TS were based on deterministic analyses and engineering judgments, but as the Probabilistic Safety Assessment (PSA) has developed it has shown to constitute a useful tool for evaluating many aspects of the TS from a risk point of view. The US NRC has fully adopted a risk informed decision process, in which PSA plays an important role. In the Nordic countries the use of risk informed methods has been discussed since the early nineties, but on the whole the methods have only been applied on a case by case basis. It is however expected that the use of risk informed decision making will increase significantly in the coming years with on-going modernization and power uprate projects, which require TS to be updated. Within a co-operation project between Nordic Nuclear Safety Research (NKS) and the Nordic PSA Group (NPSAG) the different aspects that must be taken into account in a risk based evaluation process of TS changes have been studied. The aim has been to produce a guidance document covering the most important issues to consider, but not to point out a single method as the only acceptable one.
机译:核电站的技术规格(TS)定义了工厂操作的限制和条件。原始TS是基于确定性分析和工程判断,而是由于概率的安全评估(PSA)已经开发出来,它表明它是从风险的角度来评估TS的许多方面的有用工具。美国NRC充分采用了风险明智的决策过程,其中PSA发挥着重要作用。在北欧国家,自九十年代早期以来,已经讨论了风险知情方法的使用,但在整体上,这些方法仅在案例基础上申请。但是,预计利用持续现代化和电力UPRATE项目的未来几年,利用风险明智的决策的使用将大幅增加,该项目需要更新TS。在北欧核安全研究(NKS)和北欧PSA组(NPSAG)之间的合作项目中,研究了在基于风险的TS变化的风险评估过程中必须考虑的不同方面。目的是制作一个指导文件,涵盖了最重要的问题需要考虑,但不是指出单一方法作为唯一可接受的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号