Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy

机译:协调许可办公室与公用事业规模地热能的发展

获取原文

摘要

An Icelandic investor in geothermal power projects reported in 2011 that the average time to develop a geothermal power plant in the United States can take as long as five to seven years. Permitting is a major component of the development process and appears to be a key development concern. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. As a result, the United States Department of Energy Geothermal Technologies Office (GTO) requested that the National Renewable Energy Laboratory (NREL) analyze the potential use of coordinating permit offices for utility-scale geothermal power plants. This study examines various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. 1. Key successful strategies identified include: 1.1 Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 1.2 Less dependence on a final environmental review for information sharing and permit coordination; and 1.3 State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. 2. A few of the most helpful techniques include: 2.1 A central point of contact for the developer to ask questions surrounding the project; 2.2 Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 2.3 A permit schedule or timeline to set expectations for the developer and agencies; and 2.4 Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.
机译:冰岛地热发电项目的投资者在2011年报告说,在美国开发地热发电站的平均时间可能需要长达五到七年的时间。许可是开发过程的主要组成部分,并且似乎是关键的开发问题。政府机构之间的更好协调可以减少流程的不确定性和批准的实际时间。因此,美国能源部地热技术办公室(GTO)要求国家可再生能源实验室(NREL)分析公用事业规模地热发电厂协调许可办公室的潜在用途。这项研究考察了美国西部州和联邦一级协调许可办公室的各种形式,讨论了许可自然资源项目的低效​​率和缓解技术,分析了各种方法是否易于适应公用事业规模的地热开发,并探讨了优势和不足之处。协调许可办公室面临的挑战。 1.确定的关键成功战略包括:1.1实施该方法的灵活性(即该方法的法定要求较少); 1.2减少对最终环境审查进行信息共享和允许协调的依赖; 1.3通过谅解备忘录建立的州和联邦伙伴关系,以定义角色并共享数据和/或开发人员信息。 2.一些最有用的技术包括:2.1开发人员针对项目提出问题的中心联络点; 2.2申请前会议,以协助开发商确定所有许可,监管批准以及所需的相关信息或数据; 2.3许可时间表或时间表,以设定对开发商和代理商的期望; 2.4将公共通知,评论和听证会合并为更少的同时举行的听证会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号