首页> 外文会议>International Conference on Industrial Engineering and Systems Management >A batch sizing and scheduling problem on parallel machines with different speeds, maintenance operations, setup times and energy costs
【24h】

A batch sizing and scheduling problem on parallel machines with different speeds, maintenance operations, setup times and energy costs

机译:并联机器上具有不同速度,维护操作,设置时间和能源成本的平行机器的批量大小和调度问题

获取原文

摘要

This paper considers a production scheduling problem in a Chilean company from the metalworking industry. This company produces steel balls of different diameters on parallel production lines. There are different types of production lines and each production line may have a different speed for producing each diameter. Furthermore a setup time occurs when changing the diameter produced on each machine. Besides these production and setup operations, maintenance operations have to be scheduled. These electrical machines yield high energy demands. It is therefore crucial to minimize total energy consumption, which depends on batch/machine assignment, and maximum demand on peak hours. We consider the batch sizing and scheduling problem involving electricity costs in a non-uniform parallel machine context. Given a demand for each family of steel balls, the problem consists in splitting the demand in sublots (batches) that have to be assigned and scheduled on the parallel machines together with the required maintenance operations. The goal is to complete the schedule before a common deadline while minimizing electricity costs. We propose to tackle this problem through mixed integer linear programming. We propose a global formulation and a two-phase matheuristic. Computational results on realistic instances are provided.
机译:本文考虑了来自金属加工行业的智利公司的生产计划问题。该公司在并联生产线上生产不同直径的钢球。有不同类型的生产线,每个生产线可以具有不同的速度来产生每个直径。此外,在改变每台机器上产生的直径时会发生设置时间。除了这些生产和设置操作之外,必须安排维护操作。这些电机产生高能量需求。因此,最大限度地减少总能耗,这取决于批量/机器分配,以及最大需求的高峰时段。我们考虑涉及在非均匀并行机器上下文中的电力成本的批量大小和调度问题。鉴于对每个钢球的需求,问题在于将必须在并联机器上分配和安排的单价(批次)的需求,以及所需的维护操作。目标是在常见截止日期之前完成时间表,同时最大限度地降低电力成本。我们建议通过混合整数线性编程来解决这个问题。我们提出了全球制定和两相数学素描。提供了现实实例的计算结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号