首页> 外文会议>IEEE Conference on Sustainable Utilization and Development in Engineering and Technology >On the selection of wind turbine generator based on ARMA time series
【24h】

On the selection of wind turbine generator based on ARMA time series

机译:基于ARMA时间序列的风力涡轮发电机选择

获取原文

摘要

By increasing the global warming and environmental challenges the industrial countries commit to reduce the gas emissions and develop the renewable energy based on the Kyoto protocol and also renewable portfolio standard (RPS). Among them, wind resources are more important because of the progress in the technology of its facilities to convert wind to electricity. Wind turbines manufacturer companies improve the efficiency of their facilities during the last decade. On the other hand, the wind generator firms and investors intend to select a suitable wind turbine generators (WTGs) based on the wind distribution in a specific region. In this study, Output power (MW) of four different types of WTGs has been compared. The wind speed data has been collected for 10 years from 2000 to 2009 from Canada Swift Current region. Then, the model of wind speed has been predicted with ARMA time series. In the next stage, the output power of each WTG has been determined with probability method. Finally, the suitable WTG is recommended according to the output power produced.
机译:通过提高全球变暖和环境挑战,工业国家承诺减少气体排放,并根据京都议定书和可再生组合标准(RPS)制定可再生能源。其中,风力资源更为重要,因为其设施技术的进展将风转换为电力。风力涡轮机制造商公司在过去十年中提高了其设施的效率。另一方面,风力发电机公司和投资者打算基于特定区域的风分布选择合适的风力涡轮发电机(WTG)。在该研究中,已经比较了四种不同类型的WTG的输出功率(MW)。从加拿大SWIFT当前地区的2000年到2009年收集了风速数据10年。然后,使用ARMA时间序列预测了风速模型。在下一个阶段,已经用概率方法确定了每个WTG的输出功率。最后,根据产生的输出功率建议使用合适的WTG。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号