首页> 外文会议>Collection Systems Conference >Wilmington’s LTCP Story: Proven Track Record of Addressing CSOs
【24h】

Wilmington’s LTCP Story: Proven Track Record of Addressing CSOs

机译:威尔明顿(Wilmington)的LTCP故事:应对民间组织的可靠记录

获取原文

摘要

The City of Wilmington, DE has been developing a series of increasingly improved Long TermControl Plans since the early 1990s. The City’s approach to addressing combined sewer overflowcontrol and total maximum daily load requirements is to keep their focus on key projectimplementations and performance monitoring, which has led to considerable progress inreducing pollution despite unforeseen challenges. This adaptive management approach providescontinuous environmental and operational improvements while developing valuable partnershipsthrough state, federal and local stakeholder support, and integrating innovations, such as realtime control, green infrastructure and source control to ensure sustainable future progress withmeaningful results.
机译:特拉华州威尔明顿市一直在开发一系列日益完善的长期计划 自1990年代初以来的控制计划。纽约市解决下水道溢流的方法 控制和最大每日总负荷需求是使他们专注于关键项目 实施和绩效监控,这导致了 尽管遇到了不可预见的挑战,却减少了污染。这种自适应管理方法可提供 不断改善环境和运营,同时建立有价值的合作伙伴关系 通过州,联邦和地方利益相关者的支持,以及整合创新,例如真正的 时间控制,绿色基础设施和源控制,以确保未来的可持续发展 有意义的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号