Applying Delay Analysis Techniques to the World Bank Funded Projects

机译:将延迟分析技术应用于世界银行资助的项目

获取原文

摘要

One of the main characteristics of construction projects in general is that they are subject to a wide range of risks causing delays beyond the planned completion dates. Due to the current unrest in the Middle East and North Africa, it is expected that the World Bank will fund many projects in the region to restore and build the affected and aged infrastructure systems. Under the current circumstances, these projects could be subject to delays. World Bank projects are managed through the Standard Bidding Documents for Procurement of Works (SBDW). The Conditions of Contract included in the SBDW (i.e. WB Contract) are based extensively on the Conditions of Contract for Construction published by the International Federation of Consulting Engineers (FIDIC). Since the WB Contract and the FIDIC have their own procedures that cover the submission of schedules (programmes, the term used in the WB Contract and the FIDIC), updating programmes and submission of claims for extension of time; some delay analysis techniques would fit to be applied to such contracts whereas other would not. Under these interrelated conditions, it is crucial for U.S contractors to utilize the appropriate delay analysis techniques that will enable them to study and assess the associated impact to the project schedules, and consequently submit well substantiated claims for extension of time. This paper uses a three-step methodology to present administration guidelines for appropriately applying the different delay analysis techniques to the World Bank funded projects.
机译:一般而言,建设项目的主要特征之一是,它们承受着各种风险,会导致超出计划的完工日期的延误。由于中东和北非目前的动荡,预计世界银行将为该地区的许多项目提供资金,以恢复和建设受影响和老化的基础设施系统。在当前情况下,这些项目可能会有所延迟。世界银行的项目通过《工程采购标准招标文件》(SBDW)进行管理。 SBDW中包含的合同条件(即WB合同)广泛地基于国际咨询工程师联合会(FIDIC)发布的建筑合同条件。由于WB合同和FIDIC有自己的程序,涵盖了时间表的提交(程序,WB合同和FIDIC中使用的术语),更新程序和提交延期的索赔;有些延迟分析技术适合于此类合同,而其他则不行。在这些相互关联的条件下,对于美国承包商而言,至关重要的是要利用适当的延迟分析技术,使他们能够研究和评估对项目进度的相关影响,并因此提交充分的充分证据以延长时间。本文采用三步法来介绍管理指南,以适当地将不同的延迟分析技术应用于世界银行资助的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号