首页> 外文会议>International congress on large dams;International Commission on Large Dams >SAFETY EMERGENCY SPILLWAY DESIGN TO CATER FOR OVERPUMPING AT THE INGULA PUMPED STORAGE SCHEME
【24h】

SAFETY EMERGENCY SPILLWAY DESIGN TO CATER FOR OVERPUMPING AT THE INGULA PUMPED STORAGE SCHEME

机译:安全应急溢油道设计,可防止单泵存储计划中的泵超载

获取原文

摘要

The 1332 MW Ingula Pumped Storage Scheme is currently under construction and is scheduled for completion in 2013. The Ingula scheme is located about 23 km north-east of Van Reenen, within the Drakensberg Mountain range of South Africa. The scheme consists primarily of a concrete faced rockfill upper dam, roller compacted concrete lower dam, 26 m wide machine hall and a transformer hall. The machine hall houses four reversible pump-turbines and motor-generators that generate at a rated head of 441 m.
机译:目前正在制定1332兆瓦的Ingula抽水蓄能方案 工程,预计于2013年完成。Ingula计划是 位于Van Reenen东北约23公里,在Drakensberg山内 南非范围。该方案主要由混凝土面板堆石组成 上坝,碾压混凝土下坝,26 m宽的机房和一个 变压器大厅。机房内装有四台可逆式水泵水轮机, 电动发电机的额定扬程为441 m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号