首页> 外文会议>ASCE Pipeline Division's international conference >Replacement of a Critical Water Supply Pipeline in a Dense Urban Landscape
【24h】

Replacement of a Critical Water Supply Pipeline in a Dense Urban Landscape

机译:在密集的城市景观中更换关键的供水管道

获取原文

摘要

Since its formation in 1951, the North Texas Municipal Water District (NTMWD) has been charged with developing a reliable water supply source for its 13 member cities and 60 other customers, serving more than 1.6 million people in portions of North Texas. NTMWD, like many large municipalities and water suppliers, increasingly relies on aging infrastructure to meet customer demands. Urban growth, development, and congestion are some of the major challenges in maintaining and replacing existing infrastructure in highly populated regions.In 2009, the NTMWD initiated a project to replace a critical existing 4-mile, 42-inch pipeline with a new 48-inch pipeline that supplies treated water to the NTMWD member cities of Richardson and Piano, Texas. The 35 year old existing water line had an increasing number of maintenance issues including pipe buckling, leaks, and other repairs in numerous locations. Since the 1970's, urban growth and build out had occurred in the area and created difficult challenges for replacing the existing pipeline.This paper will focus on the major design and coordination issues, construction management, and lessons learned during design and construction of the multi-million dollar project. Unique project design issues included multi-level coordination of road and utility infrastructure throughout the congested corridor, evaluation of roadway and traffic impacts to high capacity thoroughfares, repair and protection of landscaping and urban spaces per local ordinances, evaluation of alternate routes, and deep and extensive tunnel crossings of highways, major thoroughfares, and major creeks. Hydraulic and surge models were developed during design to confirm capacity and long term reliability for the new pipeline. Challenging construction issues included traffic control, sequencing and logistics for materials delivery and staging areas, and coordination with numerous landowners and businesses. Construction contract documents were specifically written to provide for an accelerated 10-month construction schedule in order to meet pipeline in-service requirements for Summer 2011. The construction phase required management of multiple installation crews in order to meet schedules and public expectations.
机译:自1951年成立以来,北德克萨斯州市政水区(NTMWD)一直负责为其13个成员城市和60个其他客户开发可靠的水源,为北德克萨斯州的部分地区的160万人提供服务。与许多大型市政当局和水供应商一样,NTMWD也越来越依赖老化的基础架构来满足客户的需求。城市增长,发展和交通拥挤是维护和更换人口稠密地区现有基础设施的主要挑战。2009年,NTMWD启动了一个项目,用一条新的48英里长的42英寸长管道替换现有的关键4英里长42英寸管道英寸的管道向NTMWD成员城市Richardson和德克萨斯州的Piano供应经过处理的水。已有35年历史的自来水管线在许多地方的维护问题越来越多,包括管道弯曲,泄漏和其他维修。自1970年代以来,该地区发生了城市发展和扩建,为更换现有管道带来了艰巨的挑战。百万美元的项目。独特的项目设计问题包括整个拥挤走廊的道路和公用事业基础设施的多层次协调,道路和交通对高通行道路的影响评估,根据当地法规对景观和城市空间的修复和保护,替代路线的评估以及深层和地下高速公路,主要通道和主要小河的广泛隧道交叉口。在设计过程中开发了液压模型和喘振模型,以确认新管道的产能和长期可靠性。具有挑战性的建设问题包括交通控制,材料交付和登台区域的排序和物流,以及与众多土地所有者和企业的协调。专门编写了施工合同文件,以期加快10个月的施工进度,以满足2011年夏季的管道使用要求。施工阶段需要多名安装人员进行管理,才能满足进度和公众期望。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号