首页> 外文会议>International conference on manufacturing engineering and automation >Dynamic Simulation on Secondary System of Nuclear Power Plant
【24h】

Dynamic Simulation on Secondary System of Nuclear Power Plant

机译:核电站二次系统的动态仿真

获取原文

摘要

The secondary system of Qinshan phase I nuclear power plant is simulated in this study.According to the characteristics of the JTopmeret model,the system is divided into six parts for modeling,which are the deaerator,the high pressure (HP) turbine,the low pressure (LP) turbine,the moisture separator reheater (MSR),the condensate system,and the feedwater system.All parts are built as the graphic automatic models in JTopmeret and debugged on the large-scale simulation platform GSE to complete the steady-state and dynamic simulation of the models.The results show that the steady-state and dynamic processes of the models are consistent with the characteristics of the actual system.It verifies the correctness of the simulation models.Thus,this research is able to provide guidance for the operation analysis and the equipment debugging of the secondary system of the nuclear power plant.
机译:秦山阶段I核电站的二级系统在本研究中模拟。根据JTOPMERET模型的特点,该系统分为六个零件进行建模,这是脱气器,高压(HP)涡轮机,低压力(LP)涡轮机,水分分离器再热器(MSR),冷凝水系统和给水系统。所有零件都是JTOPMERET中的图形自动模型,并在大规模仿真平台GSE上调试完成稳态和动态模拟模型。结果表明,模型的稳态和动态过程与实际系统的特性一致。它验证了模拟模型的正确性。本研究能够为其提供指导核电站二级系统的运行分析与设备调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号