Application of Horizontal Directional Drilling in Crossing Gan River Project Adjacent to Shengmi Bridge

机译:水平定向钻井在盛米桥横穿赣河工程中的应用

获取原文

摘要

The project of gas pipeline crossing the Gan River belongs to oversize river-crossing project, which is adjacent to Shengmi Bridge. The main crossing layers are argillaceous siltstone, while both sides of the river bed are the gravel layer and pipe ramming technology is utilized to isolate this layer.The master rig and aided rig are used to drill the pilot hole, then to ream and pullback the pipeline. Based on the engineering geological conditions and the theory of horizontal directional drilling , these specific technical measures during the whole construction process are analyzed in details, which include pipe ramming, direction control, mud technology and mud spillover control, docking, reaming and cleaning the hole, resistance-reducing technology in pullback, etc. It can provide some beneficial reference for long distance river-crossing pipeline projects in the future.
机译:河流河流的天然气管道项目属于超大河流交叉工程,毗邻盛米桥。主横穿层是氩气淤泥,而河床的两侧是砾石层和管道撞击技术用于隔离这层。主钻机和辅助钻机用于钻头钻头,然后钻孔,然后钻头并回调管道。基于工程地质条件和水平定向钻井理论,详细分析了整个施工过程中的这些特定的技术措施,包括管道夯,方向控制,泥浆技术和泥浆溢出控制,对接,铰孔和清洁孔,降低抗性技术在回调等中。它可以在未来的长途河流交叉管道项目提供一些有益的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号