FERRYBRIDGE CCPILOT100+ POST COMBUSTION CO_2 CAPTURE PILOT PLANT OPERATING EXPERIENCE AND TEST RESULTS

机译:FERRYBRIDGE CCPILOT100 +燃烧后CO_2捕集试验工厂的运行经验和测试结果

获取原文

摘要

Doosan Power Systems Limited (DPS) is developing competitive post combustion CO_2 capture (PCC) technologies for application on coal- and natural gas-fired power plants for commercialization by 2020. Utilizing globally-licensed advanced amine PCC process technology from HTC Purenergy Inc., Doosan Power Systems has, over the last 24 months, retrofitted two PCC pilot plants: 1. 160kW_t Emissions Reduction Test Facility (ERTF), located in Renfrew, Scotland. 2. 15MW_t CCPilot100+ plant installed in a slipstream on the Scottish and Southern Energy Ferrybridge Power Station in Northern England. DPS has commissioned the CCPilot100+ plant and has started a two year test program in Q1 2012. Benchmark performance on 30% w/w monoethanolamine (MEA) will be established followed by extensive parametric and long-term performance testing using the RS-2™ solvent. The paper presents CCPilot100+ plant operating experience gained during commissioning and testing and provides a summary of the test results from the first period of plant operation.
机译:斗山动力系统有限公司(DPS)正在开发具有竞争力的燃烧后CO_2捕集(PCC)技术,该技术将在2020年之前在燃煤和天然气发电厂中实现商业化。利用HTC Purenergy Inc.的全球授权高级胺PCC工艺技术,斗山动力系统公司在过去的24个月中对两个PCC试点工厂进行了改造:1.位于苏格兰伦弗鲁的160kW_t减排试验设施(ERTF)。 2.将15MW_t CCPilot100 +电厂安装在英格兰北部苏格兰和南部能源Ferrybridge电站的支流中。 DPS已调试CCPilot100 +工厂,并于2012年第一季度开始了为期两年的测试计划。将建立30%w / w单乙醇胺(MEA)的基准性能,然后使用RS-2™溶剂进行广泛的参数和长期性能测试。本文介绍了在调试和测试过程中获得的CCPilot100 +工厂运行经验,并总结了工厂第一阶段的测试结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号