首页> 外文会议>ISSMGE Technical Committee TC 211 international symposium on ground improvement >The design and execution of Settlement Mitigation Measures for Bridge 404, North South Metro Project, Amsterdam
【24h】

The design and execution of Settlement Mitigation Measures for Bridge 404, North South Metro Project, Amsterdam

机译:阿姆斯特丹北南德罗项目桥梁404结算缓解措施的设计与执行

获取原文

摘要

The Amsterdam North/South Metro line is a challenging project in an adverse urban environment of very soft soil and historical buildings founded on wooden piled foundations close to the tunnels. Following successful full-scale trials, compensation grouting was selected as the most preferable method for mitigating movements. The shield driven tunnels are to be driven both from the north and the south and are approximately 7m in diameter. Bridge 404 is located south of the Ceintuurbaan station box where the tunnels are stacked, thus the two tunnels pass under the bridge at different depths in preparation for entering the station. Bridge 404 is a historical bridge founded on brick abutments which in turn are supported on driven wooden piles approximately 13m deep. The two TBM's pass under the bridge from South to North with the Western tunnel at a depth of approximately 12m below the bridge foundations but the Eastern tunnel only has a clearance of 1.5 m below the pile toes. In order to protect the bridge from unacceptable movements a combination of compensation grouting and ground improvement was carried out. Compensation grouting was used to protect the bridge during passage of the deep tunnel and compensation grouting in combination with ground improvement was used to mitigate the effects of the shallow tunnel. As the cover under the canal is reduced and the loads of the piles do have a significant impact on the stability of the bore front, advanced 3D numerical simulations were used to support the design of the mitigating measures. The paper describes both the compensation grouting and ground improvement design in detail and presents the results of the works carried out to date.
机译:阿姆斯特丹北/南地铁线是一个挑战性的项目,这是一个充满柔软的土壤和历史建筑的不利城市环境,建立在靠近隧道的木制堆积基础上。在成功的全规模试验之后,选择补偿灌浆作为减轻运动的最优选方法。屏蔽驱动的隧道将从北部和南部驱动,直径约为7米。桥梁404位于Ceintuurbaan站盒的南部,其中隧道被堆叠,因此两个隧道在不同深度的桥下穿过,以准备进入车站。 Bridge 404是一座历史桥梁,在砖支座上成立,又支撑在大约13米的驱动的木桩上。两次TBM在南部到北桥的桥梁在桥梁基础下方的深度约为12米,但东部隧道只有1.5米的桩脚趾的间隙。为了保护桥免受不可接受的运动,进行补偿灌浆和地面改进的组合。补偿灌浆用于保护桥梁在深隧道的通过过程中,补偿灌浆与地面改进的组合用于减轻浅隧道的影响。由于运河下的盖子减少,并且桩的负荷对钻孔前端的稳定性产生了重大影响,使用高级3D数值模拟来支持减轻措施的设计。本文详细描述了补偿灌浆和地面改进设计,并提出了迄今为止进行的作品的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号