首页> 外文会议>ASCE Pipeline Division's international conference >MINDEN USES COMPETITIVE BIDDING WITH ALTERNATE PIPE MATERIALS ON LARGE DIAMETER REGIONAL WATER SYSTEM WORK
【24h】

MINDEN USES COMPETITIVE BIDDING WITH ALTERNATE PIPE MATERIALS ON LARGE DIAMETER REGIONAL WATER SYSTEM WORK

机译:在大型直径区域水系统工作中使用替代管道材料进行竞争性竞标

获取原文

摘要

In a proactive approach to solving the regional water needs south of the Reno, NV area, a proposed regional water intertie system is being constructed to supply and distribute water to the communities of Carson City, Indian Hills, and Douglas County from the Town of Minden. These systems will comprise more than 20 miles of large diameter (18-36") transmission main installed throughout the systems and communities. The Town of Minden has upgraded their distribution system to accommodate the need to move large volumes of water throughout their system to discharge points for their wholesale customers. The Town has installed more than 6 miles of large diameter (18-36") transmission main to accommodate the needs for Phase I improvements.In total, there were four sub-projects created to complete the work. Each sub-project utilized a competitive bid with multiple pipe materials, as well as separate pipe procurement procedures to gain the best pricing on piping that would meet the design intent of the project. This resulted in two of the projects utilizing PVC pipe and two of the projects utilizing ductile iron pipe. The materials procurement was viewed as a success in terms of the overall project and the benefits specifically to the Town of Minden. The Town saved substantial money and the arrangement did not adversely affect the design, quality of construction, or the end product. Contractor response to the separate material procurement was mixed. Some appreciated not having to worry about the material supply, delivery and management. Others wanted the flexibility of those options along with the flexibility to choose the materials and supplier they wished to work with.
机译:为了解决内华达州里诺市以南地区的区域水需求,采取积极的方法,正在构建一个拟议的区域水系统,以从明登镇向卡森市,印第安山丘和道格拉斯县的社区供水和分配水。 。这些系统将包括安装在整个系统和社区中的20英里以上的大直径(18-36“)传输主管道。明登镇已升级了配水系统,以适应需要在整个系统中输送大量水以进行排放的情况该镇已安装了超过6英里的大直径(18-36“)传输总管,以满足第一阶段改进的需求。总共创建了四个子项目来完成工作。每个子项目都使用具有多种管道材料的竞争性投标,并采用单独的管道采购程序来获得符合项目设计意图的最佳管道价格。这导致了两个使用PVC管的项目和两个使用球墨铸铁管的项目。从整个项目以及明登镇的利益来看,材料采购被认为是成功的。该镇节省了大量资金,并且安排没有对设计,建筑质量或最终产品产生不利影响。承包商对单独的材料采购的反应好坏参半。一些人赞赏不必担心材料的供应,交付和管理。其他人则希望这些选择具有灵活性,并能灵活选择他们希望与之合作的材料和供应商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号