首页> 外文会议>ASCE Pipeline Division's international conference >Reconstruction in an Urban Environment: Kimberley Lane 8' Water Line HDD and 54' Sanitary Sewer CIPP Rehabilitation
【24h】

Reconstruction in an Urban Environment: Kimberley Lane 8' Water Line HDD and 54' Sanitary Sewer CIPP Rehabilitation

机译:城市环境中的重建:金伯利巷8'水线硬盘驱动器和54'污水管道CIPP修复

获取原文

摘要

Kimberley Lane is located in between two major Houston retail business centers, Town & Country Village and CityCentre. The existing storm sewer along Kimberley Lane was classified as inadequately sized in the City of Houston Comprehensive Drainage Plan. The project was adopted by Tax Increment Reinvestment Zone (TIRZ) No. 17 as part of their Drainage Action Plan. Lockwood, Andrews & Newnam, Inc. (LAN), serving as Program Managers on behalf of TIRZ No. 17, provided design and construction management for the Kimberley Lane Roadway Reconstruction Project, which was completed in October 2011.In addition to complete roadway reconstruction, the project scope included approximately 1,500 LF of 8" water line, 1,300 LF of 54" cured-in-place pipe (CIPP) sanitary sewer rehabilitation, 1,200 LF 6'x3' storm sewer box culvert, and 525 LF of 36"/30"/24" storm sewers. The Contractor elected to install the 8" water line using horizontal directional drilling (HDD), which provided a cost savings and increased efficiency over traditional augering methods. This project had six phases spanning a total of 270 days in order to complete construction before the holiday shopping season began.The challenges faced with constructing this project in a highly urbanized area created a sensitive work environment. The work affected restaurants, retail businesses, schools, a church and a medical building. Since the project had a significant impact to stakeholders, steps were taken to minimize the impact to their businesses and daily schedules. This paper will focus on the economical use of trenchless technologies on the 8" water line and 54" sanitary sewer rehabilitation, and how obstacles were overcome to complete the project on budget and on time.
机译:金伯利巷(Kimberley Lane)位于休斯顿两个主要的零售商业中心之间,即Town&Country Village和CityCentre。休斯敦市城市综合排水计划中,金伯利巷沿线的现有雨水管道被归类为规模不足。该项目被第17号税收增加再投资区(TIRZ)采纳为其排水行动计划的一部分。 Lockwood,Andrews&Newnam,Inc.(LAN)代表TIRZ No.17担任项目经理,为2011年10月完成的金伯利巷道改建项目提供了设计和施工管理。 ,项目范围包括大约1500 LF的8“水管,1300 LF的54”现场固化管道(CIPP)污水管修复,1200 LF 6'x3'雨水管道涵洞和525 LF的36“ / 30“ / 24”雨水管道。承包商选择使用水平定向钻井(HDD)安装8“水管,与传统的凿孔方法相比,它可以节省成本并提高效率。该项目分为六个阶段,共计270天,以在假日购物季开始之前完成建设。在高度城市化地区建设该项目所面临的挑战创造了一个敏感的工作环境。这项工作影响了饭店,零售企业,学校,教堂和医疗大楼。由于该项目对利益相关者具有重大影响,因此已采取措施将对他们的业务和日常计划的影响最小化。本文将重点讨论在8英寸水管和54英寸下水道修复工程中非开挖技术的经济使用,以及如何克服障碍以按预算和按时完成项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号