首页> 外文会议>OCEANS >Project update: Wire following profiler improvements, sensor configuration, and schedule for the Oceans Observatories Initiative
【24h】

Project update: Wire following profiler improvements, sensor configuration, and schedule for the Oceans Observatories Initiative

机译:项目更新:跟踪以下探查器的改进,传感器配置以及海洋观测计划的时间表

获取原文

摘要

McLane Research Laboratories Inc was awarded the wire following profiler contract from the Oceans Observatories Initiative (OOI) in September 2011. This paper provides a project update that includes details of the OOI improvements to the existing moored profiler — faster inductive modem, upgraded electronics, mission planner software, and addition of a compass/tilt/acceleration/gyro module. The update includes the sensor configuration of the Coastal and Global profilers and planned schedule for the delivery of the first article (Dec 2012) and optional production units (June 2013).
机译:McLane Research Laboratories Inc在2011年9月获得海洋观测计划(OOI)的探查仪合同后被授予电线。本文提供了一个项目更新,其中包括对现有系泊探查仪的OOI改进的详细信息-更快的感应调制解调器,升级的电子设备,任务规划器软件,并增加了指南针/倾斜/加速/陀螺仪模块。更新内容包括沿海和全球剖面仪的传感器配置,以及第一批产品(2012年12月)和可选生产单元(2013年6月)的交付计划时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号