In 2010, Indian River County initiated restoration of the 6.6 miles of beach and dune known as the Sector 3 Project, which utilized previously untried technologies in that the Project: 1. was innovatively designed to avoid impacts to nearshore hardbottom, 2. was bid to allow construction via use of an offshore borrow area or upland sand mines as alternate sand sources, and 3. employed innovative sand mining processes to construct the Project meeting stringent sand quality control specifications. The Project is presented as a case study to demonstrate: 4. the nuances of the design and construction, 5. comparison of the predicted performance and that reflected in monitoring data, and 6. conclusions in the form of lessons learned relative to coastal engineering practices for beach and dune restoration.
机译:2010年,印度河县启动了6.6英里的海滩和沙丘恢复工程,即所谓的3区项目,该项目利用了以前未曾尝试过的技术,因为该项目:1.为避免对近岸硬底的影响而进行了创新设计; 2.致力于允许通过使用近海取土区或高地砂矿作为替代砂源进行施工,并且3.采用创新的砂矿开采工艺来建造符合严格砂质控制规范的项目。该项目以案例研究的形式展示,以证明:4.设计和施工的细微差别; 5.预测性能与监控数据中反映的性能的比较; 6.以与沿海工程实践相关的经验教训的形式得出结论用于海滩和沙丘修复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号