Wuyue pumped storage power station will be built in Guangshan county, Henan province of China. The upper reservoir dam of the power station is a concrete face rockfill dam, which is more than 130m high. With complex arrangement, the axis of dam consists several straight lines and arc lines. Moreover, the geological condition of the foundation is very poor, and the topographic relief is terrible and irregular. With consideration of the engineering characteristics and geological conditions, the 3-D finite element model is built, including the dam body, the dam foundation and the backfill area of the reservoir. The dam filling and water storage process are simulated, and the stress and deformation analysis of the dam and the backfill area of the reservoir are taken both after the completion and during the operating period. Furthermore, the stress deformation distribution of the concrete face is studied in details, as well as the deformation distribution of the slab joints and peripheral joints. What's more, the rationality of the dam partition and the design parameters of the dam materials are demonstrated, and the optimization methods of the dam partition and connection slab are thus put forwards.
机译:Wuyue泵送存储电站将建于中国河南省广山县。电站的上水库大坝是一个混凝土面堆石坝,高于130米。具有复杂的布置,坝轴由几条直线和弧线组成。此外,基础的地质条件非常差,地形浮雕是可怕和不规则的。考虑到工程特性和地质条件,建造了3-D有限元模型,包括坝体,坝基和水库的回填区域。模拟坝填充和储水过程,并且在完成期间和在运行期间,储存器的压力和变形区域和储存器的回填区域。此外,详细研究了混凝土面的应力变形分布,以及板关节和外围接头的变形分布。更重要的是,对坝体材料的合理性和坝材料的设计参数进行了说明,因此提出了坝隔板和连接板的优化方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号