Case history on the design, implementation, and conclusions of a study of haul roads associated with a wind farm development in Southwestern Ontario

机译:关于安大略省西南部风电场发展相关运输道路的设计,实施和结论的案例历史

获取原文

摘要

A wind farm consisting of 72 turbines is to be constructed in the Town of Lakeshore, in Southwestern Ontario. For the construction, turbine components will be hauled on a network of rural low-volume roads. When these roads were designed and built, their use for the heavy haul required by the wind farm development was never envisaged. Consequently, the Town of Lakeshore commissioned a baseline study of the roads under their jurisdiction identified on the proposed haul routes. A total of 55 road segments, with gravel, surface-treated (chip-sealed) and asphalt surfaces was examined. The study included visual pavement condition assessment, falling weight deflectometer (FWD) testing, photographic work, and video recording. The following are covered in the paper: 1.the considerations that went into the design of a cost-efficient, successful field testing program; 2.the methods used for the pavement condition survey; 3.the arrangement of the FWD study; 4.the results of the pavement condition survey; 5.the results of the FWD study; and 6.recommendations for follow-up study of the haul roads.
机译:将在安大略省西南部的湖岸镇建造一个由72台涡轮机组成的风电场。在建设过程中,将在农村低流量道路网络上牵引涡轮机部件。在设计和建造这些道路时,从未设想过将其用于风电场开发所需的重型运输。因此,湖岸镇委托对拟议运输路线中所确定的其管辖范围内的道路进行基线研究。总共检查了55条路段,这些路段具有砾石,表面处理(碎屑密封)和沥青表面。该研究包括视觉路面状况评估,重量偏折仪(FWD)测试,摄影作品和视频记录。本文涵盖以下内容:1.设计具有成本效益的成功现场测试程序时应考虑的因素; 2,路面状况调查所采用的方法; 3.FWD研究的安排; 4,路面状况调查结果; 5.FWD研究的结果; 6.建议对运输道路进行后续研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号