首页> 外文会议>World environmental and water resources congress >Modeling Erosion and Sedimentation Processes in the Chorro Creek Subwatershed to Evaluate and Develop Effective Watershed Management Approaches
【24h】

Modeling Erosion and Sedimentation Processes in the Chorro Creek Subwatershed to Evaluate and Develop Effective Watershed Management Approaches

机译:模拟乔罗河小流域的侵蚀和沉淀过程,以评估和开发有效的流域管理方法

获取原文

摘要

The Morro Bay Watershed, located in San Luis Obispo County, California, covers more than 48,000 acres of land and discharges into Morro Bay through the Morro Bay National Estuary (MBNE). The Chorro Creek Subwatershed consists of approximately 30,000 acres of the overall watershed. The MBNE provides an ecosystem that supports a variety of wildlife, from the common sea gull to the endangered sea otter. The estuary is also home to over 200 species of birds. The operational waterfront of the Morro Bay Harbor was and continues to be a strong supporter to the local economy of the City of Morro Bay. Numerous studies were conducted since the 1990s throughout the watershed to study the sedimentation of the estuary and bay and identified accelerated erosion and subsequent sedimentation as a major threat to sustainability of the bay. As a result, various Best Management Practices (BMPs) have been implemented in the watershed to reduce sediment loading and transport to the bay. Localized evaluations of various BMPs have been performed to investigate effectiveness of individual BMPs. This paper consolidates this information and develops a comprehensive spatially distributed watershed simulation model (1) for detailed understanding of the erosion and sedimentation processes in the watershed; (2) to evaluate a watershed scale effectiveness of the conservation practices that have been installed in the watershed; (3) to identify optimal BMP types and sites that may be used in the future to further reduce sedimentation of the bay at minimal cost; (4) to organize and document the various sources of data and studies that have been performed to date in the Chorro Creek subwatershed. Soil and Water Assessment Tool (SWAT) was used to develop the model and to evaluate the pre and post BMP implementation characteristics in the subwatershed. Combining the data and efforts of past BMP evaluations, land use, soil type, climate data, and streamflow data, statistical evaluations, and model sensitivity analysis will help build and calibrate a robust SWAT model that can be used to track BMP evaluation efforts, as well as other watershed management tasks. Through the evaluation of BMPs in the watershed, efforts can be made to implement the more successful BMPs in the watershed or in other similar watersheds. Sensitivity analysis was performed using a global sensitivity analysis method and streamflow and sediment yield was calibrated using the Shuffled Complex Evolution-University of Arizona.
机译:位于加利福尼亚州圣路易斯奥比斯波县的莫罗湾流域,占地超过48,000英亩,并通过莫罗湾国家河口(MBNE)排入莫罗湾。 Chorro Creek子流域约占总流域30,000英亩。 MBNE提供了一个生态系统,支持从野生海鸥到濒临灭绝的水獭的各种野生生物。河口也是200多种鸟类的家园。莫罗贝港的运营滨水区过去一直并将继续为莫罗贝市的当地经济提供强有力的支持。自1990年代以来,在整个流域进行了大量研究,以研究河口和海湾的沉积,并确定加速侵蚀和随后的沉积是对该海湾可持续性的主要威胁。结果,在流域中实施了各种最佳管理实践(BMP),以减少沉积物的装载和向海湾的运输。已经对各种BMP进行了局部评估,以调查单个BMP的有效性。本文整合了这些信息,并开发了一个综合的空间分布的流域模拟模型(1),以详细了解流域的侵蚀和沉积过程; (2)评估流域已采取的保护措施的流域规模有效性; (3)确定最佳的BMP类型和地点,以便将来以最小的成本进一步减少海湾的沉积; (4)组织并记录迄今为止在Chorro Creek子流域进行的各种数据和研究来源。使用土壤和水评估工具(SWAT)来开发该模型,并评估该小流域BMP实施前后的特征。结合过去BMP评估,土地利用,土壤类型,气候数据和水流数据,统计评估和模型敏感性分析的数据和努力,将有助于建立和校准强大的SWAT模型,该模型可用于跟踪BMP评估工作,例如以及其他流域管理任务。通过对流域中的BMP进行评估,可以努力在流域或其他类似流域中实施更成功的BMP。使用全局灵敏度分析方法进行灵敏度分析,并使用美国亚利桑那州的混洗复杂演化大学对流量和沉积物产量进行校准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号