首页> 外文会议>International conference on pipelines and trenchless technology;ICPTT 2011 >Water Pipeline Renewal Evaluation Using AWWA Class IV CIPP, Pipe Bursting, and Open-cut
【24h】

Water Pipeline Renewal Evaluation Using AWWA Class IV CIPP, Pipe Bursting, and Open-cut

机译:使用AWWA IV级CIPP,管道破裂和明挖进行水管道更新评估

获取原文

摘要

Renewal of old and crumbling underground pipelines in the U.S. presents a vast opportunity to utilize new techniques and methodologies such as Trenchless Technology. TT is a fairly new approach to underground pipeline renewal and the concept is generally divided to two main categories - "Installation" and "Renewal". Cured- In- Place Pipe (CIPP) and Pipe Bursting (PB) are among the most widely recognized renewal methods and although there have been numerous papers and considerable researches in both methods, there is a need to evaluate these two methods in a comparison format with traditional open-cut technique to determine the advantages and disadvantages of each method from the perspective of differing parameters. This paper will evaluate the CIPP AWWA Class IV, PB, and open-cut methods based on cost, diameter size ability, and service re-connection to answer the simple question; which one to use for water main distribution renewal?
机译:美国旧的地下管道的更新换代为利用新技术和新方法(例如无沟技术)提供了巨大的机会。 TT是地下管线更新的一种相当新的方法,该概念通常分为两个主要类别-“安装”和“更新”。现场固化管(CIPP)和管爆裂(PB)是最广为人知的更新方法,尽管有大量论文和这两种方法的大量研究,但仍需要以比较的形式对这两种方法进行评估用传统的开挖技术从不同参数的角度确定每种方法的优缺点。本文将基于成本,直径大小能力和服务重新连接来评估CIPP AWWA IV级,PB级和开放式方法,以回答这一简单问题;哪个用于供水总管更新?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号