首页> 外文会议>Air and Waste Management Association annual conference and exhibition >Implementation of the Clean Development Mechanism (CDM) Project in Egypt
【24h】

Implementation of the Clean Development Mechanism (CDM) Project in Egypt

机译:在埃及实施清洁发展机制(CDM)项目

获取原文

摘要

The Government of the Arab Republic of Egypt has issued Law No. 4/1994, for the Protection of the Environment. Law 4/1994 addresses pollution resulting from existing establishments, as well as potential pollution from new establishments and expansions of existing ones. According to the law, new establishments are required to follow the United Nations Framework Convention on Climate Change (UNFCCC) and Kyoto Protocol Egypt has also established the Egyptian Designated National Authority (DNA), which consists of two components: the Egyptian Council for CDM (Ministerial Decree No.42/2005) and the Egyptian Bureau for CDM (Ministerial Decree No.45/2005). The Ministry of State for Environmental Affairs is the focal point of the convention and is undertaking the many activities such as conducting capacity building programs in the area of climate change and Clean Development Mechanism (CDM), implemented and submitted the Initial National Communication in 1999, and the Second National Communication (SNC) in 2010. They have also started conducting the third national communication, restructuring of the National Committee of the Climatic Changes in 2007 by decree of the Prime Minister, supervising all issues of Climate Change in Egypt and establishing the Climate Change Central Department (CCCD) inside the Egyptian Environmental Affairs Agency (EEAA) in 2009. This paper presents these activities and the CDM portfolio of Egypt including all projects in the areas of renewable energy, the forestation & reforestation, waste, transportation, fuel switching, energy efficiency and industry. This portfolio is presenting with some statistics the status of implementation of these projects (registered, approved, accepted and pipelines).
机译:埃及阿拉伯共和国政府已颁布第4/1994号法律,保护环境。第4/1994号法律处理了现有机构造成的污染,以及新机构和现有机构的扩建带来的潜在污染。根据法律,要求新机构遵守《联合国气候变化框架公约》(UNFCCC)和《京都议定书》。埃及还建立了埃及指定的国家机构(DNA),该机构包括两个组成部分:埃及CDM理事会(第42/2005号部长法令和埃及CDM局(第45/2005号部长法令)。环境事务部是该公约的重点,并正在开展许多活动,例如在气候变化和清洁发展机制领域开展能力建设计划,并于1999年实施并提交了《初次国家信息通报》,以及2010年的第二次国家信息通报(SNC)。他们还开始进行第三次国家信息通报,根据总理的命令在2007年重组了气候变化全国委员会,监督埃及的所有气候变化问题,并建立了2009年,埃及环境事务署(EEAA)内的气候变化中央部(CCCD)。本文介绍了埃及的这些活动和CDM项目,包括可再生能源,造林和再造林,废物,运输,燃料等领域的所有项目。开关,能源效率和工业。该产品组合通过一些统计数据显示了这些项目(已注册,已批准,已接受和正在筹备中)的实施状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号