PERMEATION GROUTING KEEP NORFOLK SOUTHERN ON TRACK IN GOSHEN

机译:渗透灌浆保持诺福克南部在戈什赛道

获取原文

摘要

In the Spring of 2017, the City of Goshen, Indiana began replacing existing water mains throughout the city as part of the U.S. Hwy 33 Relocation Project. The proposed water main alignment intersected existing Norfolk Southern rail lines at three locations, as well as a single private spur. To avoid interference with rail operations, the use of jack and bore methods were selected for utility installation. A geotechnical investigation revealed adverse conditions for jack and bore installation in the granular soils beneath the tracks. The geotechnical engineer recommended the use of chemical grouting to create a grouted mass prior to the jack and bore operation to prevent track settlement. Nicholson Construction, working under a local contractor, was hired to perform the permeation grouting. Nicholson installed 1,500 total linear feet of tube-a-machete (TAM) pipe and injected 33,000 gallons of chemical grout to complete the work. To avoid existing utilities, the TAM pipes were installed horizontally beneath the tracks along the jack and bore alignment. The chemical grout consisted of sodium silicate, a reactant, and water. The once sandy soil beneath the tracks became a firm mass that would resist cave-in after treatment. Overall, Nicholson completed the permeation grouting ahead of schedule without impacting rail traffic. The following paper will discuss the design and construction of the work and explore the successes and challenges faced along the way.
机译:2017年春天,印第安纳州戈森市开始在整个城市中取代现有的水管,是美国的一部分。建议的水主要对齐在三个地点交叉存在现有的诺福克南部铁路线,以及单一的私人刺激。为避免干扰轨道操作,选择了使用千斤顶和钻孔方法进行公用事业安装。岩土工程揭示了轨道下方颗粒土壤中千斤顶和孔装置的不利条件。岩土工程师建议使用化学灌浆在千斤顶之前在升降机和钻孔操作之前产生灌浆质量,以防止轨道沉降。在当地承包商下工作的尼古尔森建筑被聘请渗透灌浆。 Nicholson安装了1,500个管 - 砍刀(TAM)管道的总线脚,并注入了33,000加仑的化学灌浆,以完成工作。为避免现有的公用事业,TAM管道沿着千斤顶和钻孔对准水平地安装在轨道下方。化学灌浆由硅酸钠,反应物和水组成。轨道下面的沙质土壤成为一种牢固的质量,可以在治疗后抵抗塌陷。总体而言,Nicholson在没有影响铁路交通的情况下完成了渗透灌浆。以下论文将讨论工作的设计和建设,并探讨沿途所面临的成功和挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号