US 190 MISSISSIPPI RIVER BRIDGE, A COMBINED AILROAD/HIGHWAY BRIDGE REHABILITATION

机译:US 190 Mississippi River Bridge,一个合并的Ailroad / Highway Bridge Rehilitation

获取原文

摘要

The U.S. 190 Mississippi River Bridge crosses high above the Mississippi River between Port Allen and the capital City of Baton Rouge, Louisiana. The combination bridge carries four travel lanes and a single track of railroad that services Union Pacific Railroad and Kansas City Southern. The bridge, completed in 1940, consists of 8,887 feet of railroad approach spans, 2,571 feet of highway approach spans, and 3,326 feet of five cantilever steel through-truss main spans for a total length of 12,213 feet. The highway travel lanes are supported by floorbeams cantilevered on either side of the truss, and the railroad travels through the center of the trusses. This project included the rehabilitation, complete cleaning and painting, and general structural rehabilitation of various bridge members, including cross frame chord members and connection angles, top lateral bracing members, replacement of main truss vertical and diagonal lacing bars, deteriorated interior stiffeners of main truss verticals, deteriorated diagonals at portals, anchor bolt and column rehabilitation for approach bents, bearing pins and corroded complex stirrup bearings, rehabilitation of false chord expansion devices, replacement of cracked gusset plates, and patching of concrete spalls at bearings and retaining walls. Schemes for jacking and temporary support of members under live loads from highway traffic and Cooper E-80 railway load during rehabilitation were evaluated. Structural analysis that included traffic reduction during phases of construction was also considered. Traffic control and phasing for maintenance of traffic during various phases of construction were addressed.
机译:美国190年密西西比河桥在港口艾伦港和路易斯安那州的罗恩·鲁典首都之间的密西西比河高于密西西比河。联合桥配有四条旅行车道,一条铁路的铁路,服务联盟太平洋铁路和堪萨斯城南方。该桥于1940年完成,由8,887英尺的铁路方法跨越,2,571英尺高速公路横跨跨越,3,326英尺的五个悬臂钢通过桁架主跨度为12,213英尺。公路旅行车道由桁架两侧的地板悬臂上的支撑,铁路通过桁架的中心旅行。该项目包括康复,完整的清洁和绘画,以及各种桥梁构件的一般结构康复,包括交叉框架和弦成员和连接角,顶部横向支撑构件,更换主桁架垂直和对角线系杆,主桁架的内部加强筋劣化垂直,在门户,锚定螺栓和方法排架柱康复劣化对角线,轴承销和腐蚀复杂镫轴承,假弦膨胀装置复原,更换破裂角撑板的,并且在轴承混凝土剥落的修补和挡土墙。评估了从公路交通和库珀E-80铁路负荷的现场负荷下的成员的超出和临时支持的计划。还考虑了包括施工阶段的流量减少的结构分析。解决了交通管制和维持在建设的各个阶段期间的运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号