NEW CSXT BRIDGE - DEEP FOUNDATION INSTALLATION IN KARST BEDROCK

机译:新的CSXT桥 - 岩溶基岩的深基础安装

获取原文

摘要

Geotechnical investigations and engineering programs are the cornerstone of structural bridge design, and it is paramount to gather reliable information during field investigations. However, geotechnical engineering and the geologic sciences are characterized by uncertainty and railroads often encounter variable geologic conditions during foundation installation. This was the case with a CSX Transportation (CSXT) bridge crossing over Buck Creek between the cities of Helena and Pelham, Alabama. The project is located in an area that is underlain by karst bedrock consisting of limestone and dolomite. Both types of bedrock present are subject to dissolution from mildly acidic groundwater penetrating the bedrock through joints or discontinuities. The dissolution process produces an irregular bedrock surface that may contain clay-filled, open discontinuities in the bedrock. The differential weathering process isolates remnant rock units, leaving weathered-in-place boulders within a soil matrix. The constructed Helena CSXT Bridge is nearly 600 feet in total length and consists of five (5) evenly spaced spans supported by a combination of driven HP14x89 steel piles and micropiles installed within competent bedrock. This paper will provide background to the geotechnical design and challenges faced during installation of foundation elements within karst bedrock. The design team, including geotechnical and structural engineers, worked together to find successful solutions to minimize the impacts of the variable bedrock line while maintaining the construction progress. Continuous engagement by the geotechnical design engineers throughout the foundation construction phase was key to a successful project completion.
机译:岩土性调查和工程计划是结构桥设计的基石,在现场调查期间收集可靠的信息至关重要。然而,岩土工程和地质科学的特点是不确定性和铁路经常在基础安装过程中遇到可变地质条件。这是一个CSX运输(CSXT)桥在Helena和Pelham,阿拉巴马州的城市之间穿过巴斯克里克。该项目位于一个由石灰石和白云石组成的喀斯特岩石地区的区域。存在的两种类型的基岩受到轻度酸性地下水的溶解,通过关节或不连续性穿透基岩。溶出过程产生不规则的基岩表面,其可含有粘土的粘土,在基岩中的开放不连续性。差动风化工艺隔离残余岩石单元,在土壤基质内留下风化的巨石。构造的海伦娜CSXT桥的总长度近600英尺,包括五(5)个均匀间隔的跨度,由驱动的HP14X89钢桩和微型计算机组合而来的,安装在竞争力的基岩中。本文将在岩溶基岩内安装基础元素期间面临的岩土设计和挑战。设计团队(包括岩土和结构工程师)共同努力,找到成功的解决方案,以最大限度地减少可变基岩线的影响,同时保持施工进度。岩土设计工程师在整个基础建设阶段的持续参与是成功项目完成的关键。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号