首页> 外文会议>World energy engineering congress;WEEC 2011 >Energy Conservation through Ongoing Commissioning
【24h】

Energy Conservation through Ongoing Commissioning

机译:通过持续调试实现节能

获取原文

摘要

Building systems and their controls have become very complex. A modern building automation system (BAS) can have thousands of data points, a network of controllers, and software with programming logic that is often inaccessible by the building personnel. If not regularly calibrated, maintained, and monitored, the complexity of the system can become more a liability than an asset. This paper is based on observations and lessons learned through field experience, as opposed to an in-depth discussion of controls theory or operations and maintenance methodologies. Based on experience from amultitude of retro-commissioning and energy efficiency projects, a pattern has emerged: existing buildings have a significant number of BAS defects which cause excessive energy consumption, reliability problems, and occupant comfort issues. Through case studies, this paper illustrates the importance of implementing a process for uncovering control system defects and will discuss ongoing commissioning as a potential method for identifying and resolving BAS defects and achieving optimum building energy efficiency and system reliability.
机译:建筑系统及其控制已变得非常复杂。现代的楼宇自动化系统(BAS)可以具有成千上万的数据点,控制器网络以及带有编程逻辑的软件,而这些逻辑通常是建筑人员无法访问的。如果不定期进行校准,维护和监视,则系统的复杂性可能会变成负债而不是资产。本文基于从现场经验中获得的观察和教训,而不是对控制理论或操作与维护方法的深入讨论。根据大量改造和节能项目的经验,出现了一种模式:现有建筑物存在大量的BAS缺陷,这些缺陷会导致过多的能耗,可靠性问题以及居住者的舒适感。通过案例研究,本文说明了发现控制系统缺陷的过程的重要性,并将讨论正在进行的调试作为识别和解决BAS缺陷并实现最佳建筑节能和系统可靠性的潜在方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号