Studies on Problems and Countermeasures of Agent Construction System in Chinese government investment projects —Based on the Incentive perspective

机译:基于政府激励项目的中国政府投资项目代建制存在的问题及对策研究

获取原文

摘要

Agent construction system is the market-oriented reforms of non-operating government investment projects, which has been still in the pilot phase. Authors' aim is to figure out the system's problems and their reason, and put forward suggestions. This article lists the problems of agent construction system, and they are marketaccess system, licensing, and management fee standards. The reason is the unsound of agent construction system's implementation and a simple incentive model is constructed and an optimal contract is derived by the optimization methods of OR (Operations Research), which is also the innovation of article. At last, some relevant proposals are proposed, to improve the efficiency of agent construction system implementation effectively, such as the profits of construction management fees are fixed remuneration, government-investment department allocate management fees to the agent company in phases.
机译:代建制是对非经营性政府投资项目的市场化改革,目前仍处于试点阶段。作者的目的是找出系统的问题及其原因,并提出建议。本文列出了代理人构建系统的问题,它们是市场准入系统,许可和管理费标准。原因是代理构建系统的实施不健全,构建了简单的激励模型,并通过OR(Operations Research)的优化方法得出了最优合同,这也是本文的创新之处。最后提出了一些相关建议,以提高代建制的有效实施效率,例如,将建设管理费的利润固定为报酬,政府投资部门分期向代办公司分配管理费。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号