首页> 外文会议>International conference on vibration, structural engineering and measurement >Roof Structural Program of Main Plant for GuanDi Hydropower Station
【24h】

Roof Structural Program of Main Plant for GuanDi Hydropower Station

机译:关帝水电站主厂屋顶结构方案

获取原文

摘要

Concrete beam and slab system is commonly applied in the main plant roof of hydropower station, which is difficult for construction and slow, having a great impact on the construction period. For the main plant roof structure (span of 30 metres)of GuanDi hydropower station in Yalong River, this paper proposes three light steel roof systems, which are arched corrugated steel roof, light gauge-steel and shell roof, and carries detailed analyses and comparisons on the force calculation, appearance, the amount of steel, site construction, anticorrosive performance and other aspects. Regarded that the light gauge-steel roof is the most suitable system for the main plant roof of hydropower station, this paper introduces the layout, arched truss design and purlin of light gauge-steel roof, providing reference for design and application of similar projects.
机译:水电站主厂房顶板普遍采用混凝土梁板系统,施工难度大,施工速度慢,对工期影响很大。针对雅long江关帝水电站主厂房屋顶结构(跨度30米),提出了三种轻钢屋面系统,分别为拱形波纹钢屋面,轻钢尺壳式屋面,并进行了详细的分析和比较。在受力计算,外观,钢材用量,工地施工,防腐性能等方面。考虑到轻钢龙骨屋顶是水电站主体厂房屋顶最合适的系统,本文介绍了轻钢龙骨屋顶的布置,拱形桁架设计和pur条,为类似工程的设计和应用提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号