首页> 外文会议>International conference on ground control in mining >Surface Subsidence Velocity of Fully–Mechanized Thick Seam Top Coal Caving Mining
【24h】

Surface Subsidence Velocity of Fully–Mechanized Thick Seam Top Coal Caving Mining

机译:厚煤层综放开采地表沉降速度

获取原文

摘要

Surface subsidence for fully mechanized thick seam top coalcaving was measured, and surface subsidence characteristics werethen analyzed. The subsidence initiation distance from the set-uproom and the advance influence distance ahead of the advancinglongwall face were studied. The maximum surface subsidencevelocity and the delay angle of the maximum subsidence velocitywere determined. The results indicated that surface movementwas intensive, the surface subsidence velocity was very high, theground surface was badly damaged, and the subsidence initiationdistance from the set-up room was smaller than that in generalgeological and mining condition.
机译:综采厚煤层顶板的地表沉陷。 测量了崩落,地表沉降特征为 然后进行分析。距设置的沉降起始距离 的空间和前进前移的影响距离 研究了长壁面。最大地面沉降 速度和最大沉陷速度的延迟角 被确定。结果表明表面运动 密集,地表沉降速度非常高, 地面严重受损,下沉开始 距设置室的距离比一般人小 地质和采矿条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号