首页> 外文会议>International conference on ground control in mining >A Study on Geotechnical Risks in Interaction Between Open–Pit and Block Caving
【24h】

A Study on Geotechnical Risks in Interaction Between Open–Pit and Block Caving

机译:露天矿与崩落崩落相互作用中的岩土工程风险研究

获取原文

摘要

There are several geotechnical challenges and risks inherentin the interaction between the open-pit and block cave miningenvironments. This is especially true when they have to worksimultaneously for a short time, as well as when only the cavingoperation is continued. Some of these challenges and risks includethe induced zones of stress due to the large and deep open-pit,instability of the slope, instability of the crown pillar and waterinflows, subsidence, and sometimes instability of the main accessesto the block cave portion of the mine. These challenges usuallyoccur due to cave propagation. In this paper, these geotechnicalchallenges and associated risks have been studied and discussed.It was concluded that the majority of the mentioned geotechnicalrisks could be decreased, and often eliminated, by consideringthe appropriate dimensions of a stable crown pillar, especially insimultaneously working open-pit and block caving operations.
机译:存在一些固有的岩土工程挑战和风险 在露天和块状洞穴开采之间的相互作用 环境。当他们必须工作时尤其如此 同时在短时间内,以及仅在探洞时 操作继续。这些挑战和风险包括 大而深的露天矿导致的应力诱发区域, 边坡的不稳定性,冠柱和水的不稳定性 主要通道流入,沉陷,有时甚至不稳定 到矿山的黑洞部分。这些挑战通常 由于洞穴传播而发生。在本文中,这些岩土工程 挑战和相关风险已得到研究和讨论。 得出的结论是,大多数提到的岩土工程 通过考虑以下因素可以降低风险,并且通常可以消除风险 稳定的冠状支柱的合适尺寸,尤其是在 同时进行露天和大块崩落作业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号