首页> 外文会议>International conference on computer and network technology >Analysis of Multi-Resources Leveling Problem with Changeable Resource Intensity and Risk Float Time
【24h】

Analysis of Multi-Resources Leveling Problem with Changeable Resource Intensity and Risk Float Time

机译:资源强度和风险浮动时间可变的多资源均衡问题分析

获取原文
获取外文期刊封面目录资料

摘要

A new multi-resources leveling model with changeable resource intensity and risk float time is established in this paper. With presetting the new variable of risk float time at the end of activity float time, the new model can realize the new function that the project risk can be considered at the same time the resource leveling process is calculated. The validity of the improved model in this paper is verified with the help of genetic algorithm.
机译:建立了一种新的具有可变资源强度和风险浮动时间的多资源均等化模型。通过在活动浮动时间结束时预设风险浮动时间的新变量,新模型可以实现新功能,即在计算资源均衡过程的同时可以考虑项目风险。借助遗传算法验证了本文改进模型的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号