首页> 外文会议>2011 IEEE 3rd International Conference on Communication Software and Networks >A tentative study on the demand-supply management with the effect of house connection pipe and storage pumping system
【24h】

A tentative study on the demand-supply management with the effect of house connection pipe and storage pumping system

机译:房屋连接管与储水抽水系统影响下的供需管理试探

获取原文

摘要

Hydraulic design of pressurized water supply and distribution system generally is subjected to satisfy adequate consumer demand with minimum specified pressure within network. Available pressure and distribution of the flow to the consumer end are quite significantly affected by the house connection (HC) pipe, storage reservoir (including both the underground and roof tank) and storage type, pumping system and demand pattern. In addition, supply through a distribution pipe is also affected by the relative consumption behavior of all HCs connected with that pipe. Under the Dhaka Water Supply Sector Development Project (DWSSDP); Dhaka Water Supply and Sewerage Authority (DWASA) aims to develop a pressurized water supply and distribution system in Dhaka. This study investigates the change in supply pattern due to presence of above factors in between consumer and distribution network. Storage inflow variation due to change in HC pipe diameter and available pressure was analyzed. Again, effects of pumping rate on inflow-outflow of the both storages are determined for a typical consumption pattern. Adequacy of pumping schedule, pumping rate and HC pipe diameter to utilize storage capacity are also investigated. Simplified tentative analyses have been carried out for a single HC (a typical 10 storey building). Flow in HC pipe, storage behavior and peaking of demand are found to be affected quite significantly in the analyses. Finally probable effective combination of HC pipe and pumping system is analyzed to find optimum pressure-flow management.
机译:加压给水和分配系统的水力设计通常要满足网络中最小指定压力下的充分消费者需求。房屋连接(HC)管道,储水库(包括地下和屋顶储水箱),储水类型,泵送系统和需求模式会显着影响可用压力和流向用户端的流量分配。此外,通过分配管道的供应也受到与该管道连接的所有HC的相对消耗行为的影响。在达卡供水部门发展项目(DWSSDP)下;达卡供水和污水处理局(DWASA)的目标是在达卡开发加压供水和分配系统。本研究调查了由于消费者和分销网络之间存在上述因素而导致的供应模式变化。分析了由于HC管直径和可用压力的变化而导致的存储流入量变化。再次,针对典型的消耗模式确定抽水率对两个储存器的流入-流出的影响。还研究了抽水计划,抽水速度和HC管直径是否能充分利用存储容量。对单个HC(典型的10层建筑)进行了简化的初步分析。分析发现,HC管中的流量,存储行为和需求高峰都受到很大影响。最后,分析了HC管和泵系统的可能有效组合,以找到最佳的压力流管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号