首页> 外文会议>Power Engineering and Automation Conference (PEAM), 2011 IEEE >The post-evaluation index system for preparatory work of transmission and transformation projects
【24h】

The post-evaluation index system for preparatory work of transmission and transformation projects

机译:输变电项目准备工作后评价指标体系

获取原文

摘要

Considering the characteristics of the transmission and transformation project, focusing on the wink links of the preparatory work, this paper builds the post-evaluation index system of preparatory work. In accordance with the interactional relationship among the indexes, the Analytic Hierarchy Process (AHP) based evaluation model is introduced to confirm the weight of indexes. Finally, the results of an empirical analysis on a certain transmission and transformation project's preparatory work show that this index system can dig up some key problems in preliminary management and give a good reference for subsequent projects decision-making and management level.
机译:考虑到输变电工程的特点,着眼于筹备工作的眨眼环节,建立了筹备工作的后评价指标体系。根据指标之间的交互关系,引入基于层次分析法的评价模型来确定指标的权重。最后,对某输变电项目前期工作的实证分析结果表明,该指标体系可以初步解决初步管理中的一些关键问题,为后续项目的决策和管理水平提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号