首页> 外文会议>IEEE AFRICON 2011 >Initial results of investigations into introducing new HVDC injections into the Cape network to increase transfer capacity
【24h】

Initial results of investigations into introducing new HVDC injections into the Cape network to increase transfer capacity

机译:将新的高压直流输电引入Cape网络以提高输电能力的调查的初步结果

获取原文

摘要

The early phases of the development of the Cape network entailed construction of 400kV lines to link supplied from the generation pool in the northern part of the country, in Mpumalanga, with the loads in the Cape, i.e., the Western and Southern grids of Eskom. Once the 400kV network was matured, it became apparent that further commissioning of 400kV lines led to lesser and lesser improvements in voltage stability limit improvements. This led to consideration of 765kV lines for further expansion. For the future, considerations are being made into introducing high voltage direct current (HVDC) systems into the Cape network to further increase its voltage stability limit to support future loads. This paper presents the results of the preliminary work to assess the techno-economic merits of introducing HVDC into the Cape. Some lessons learnt and further questions to be looked into are discussed.
机译:开普敦网络的发展初期需要建设400kV线路,以连接该国北部Mpumalanga的发电池所提供的电力与开普敦(即Eskom的西部和南部电网)的负荷。一旦400kV网络成熟,很明显,进一步调试400kV线路会导致电压稳定性极限改善的改善越来越小。因此,考虑了765kV线路的进一步扩展。对于未来,正在考虑将高压直流(HVDC)系统引入Cape网络,以进一步提高其电压稳定性极限以支持未来的负载。本文介绍了初步工作的结果,以评估将高压直流输电引入开普省的技术经济优势。讨论了一些经验教训和需要探讨的其他问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号