首页> 外文会议>2011 IEEE Trondheim PowerTech >Optimal switch allocation for automatic load transfer in distribution substations
【24h】

Optimal switch allocation for automatic load transfer in distribution substations

机译:配电变电站中自动负荷转移的最佳开关分配

获取原文

摘要

This work proposes a methodology for optimized allocation of switches for automatic load transfer in distribution systems in order to improve the reliability indexes by restoring such systems which present voltage classes of 23 to 35 kV and radial topology. The automatic switches must be allocated on the system in order to transfer load remotely among the sources at the substations. The problem of switch allocation is formulated as nonlinear constrained mixed integer programming model subject to a set of economical and physical constraints. A dedicated Tabu Search (TS) algorithm is proposed to solve this model. The proposed methodology is tested for a large real-life distribution system.
机译:这项工作提出了一种为配电系统中的自动负载转移优化开关分配的方法,以通过恢复具有23至35 kV电压等级和径向拓扑的系统来提高可靠性指标。为了在变电站的各个源之间远程转移负载,必须在系统上分配自动开关。开关分配问题被表述为受一组经济和物理约束的非线性约束混合整数规划模型。提出了一种专用的禁忌搜索(TS)算法来求解该模型。所提出的方法已针对大型现实生活中的分发系统进行了测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号