Construction of the geological disaster real-time monitoring demonstration station in Wushan County

机译:巫山县地质灾害实时监测示范站建设

获取原文

摘要

Real-time monitoring can achieve of automatic continuous monitoring data collection, and the first time in the information will reach the decision-making for analysis, so as to avoid times squandered which cause serious bad consequences. Therefore that have been regarded by more and more people and become the inevitable trend of monitoring of the geological disaster. The research results are systematically summed up of the Research and Demonstration about Technology & Method on Geologic Hazard Monitoring and Prewarning of the Ministry of Land and Resources P.R.C, introduce the building process of the system of the demonstration, which would provide reference of similar system building.
机译:实时监控可以实现自动连续监控数据的收集,并在信息首次到达决策时进行分析,以免浪费时间浪费而造成严重的不良后果。因此,越来越受到人们的重视,成为监测地质灾害的必然趋势。国土资源部《地质灾害监测预警技术与方法研究与论证》对研究成果进行了系统总结,介绍了示范系统的建设过程,为类似系统的建设提供参考。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号