首页> 外文会议>2011 International Symposium on Water Resource and Environmental Protection >Analysis on the impact of ice removal in winter on economic benefits of Dazhuang Hydropower Station
【24h】

Analysis on the impact of ice removal in winter on economic benefits of Dazhuang Hydropower Station

机译:冬季除冰对大庄水电站经济效益的影响分析

获取原文

摘要

Ice flood disasters in winter often harass the northern China, which have brought out adverse impact on water conservancy facilities and the normal life of residents living by the river basin. In natural conditions, the Taohe River does not freeze in winter; however, its flow characteristics and flow regime have been currently changed due to the construction of hydropower stations in Taohe River upstream, the ice is correspondingly apt to cause harm. According to the two-year data of actual running of reservoir in winter for Dazhuang Hydropower Station in Taohe River upstream, the present paper conducts an in-depth analysis over the impact of the ice removal in winter on the design for years' average indices of power generation for cascade hydropower stations and Dazhuang Hydropower Station, and optimizes the joint scheduling mode of ice removal in winter for reservoirs of hydropower stations in Taohe River upstream, thereby increasing the total power generation of cascade power stations and economic benefits of Dazhuang Hydropower Station. Futhermore, this paper also proposes that the determinant of reservoir water level and land acquisition and resettlement in Taohe River upstream is the ice conditions in winter rather than summer floods.
机译:冬季的冰洪灾害经常骚扰中国北方,给水利设施和流域居民的正常生活带来不利影响。在自然条件下,Tao河冬天不结冰。但是,由于Tao河上游水电站的建设,其水流特征和水流状态目前已发生变化,因此冰很容易造成危害。根据Tao河上游大庄水电站冬季水库实际运行的两年数据,深入分析了冬季除冰对水库多年平均设计指标的影响。梯级水电站和大庄水电站发电,优化了Tao河上游水库水库冬季除冰联合调度模式,从而增加了大庄水电站梯级电站总发电量和经济效益。此外,本文还提出,Tao河上游水库水位和征地安置的决定因素是冬季的冰冻条件,而不是夏季的洪水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号