INSTALLATION OF RAILBED DRAINAGE CASINGS IN EXTREME CONDITIONS UTILIZING THE PIPE RAMMING METHOD

机译:利用管道夯法在极端条件下安装轨迹排水壳

获取原文

摘要

Water is a powerful force. Drainage culverts direct water away from areas that need protection from erosion. In Ardmore, Oklahoma, the Burlington Northern Santa Fe Railway Company identified three failed drainage culverts that were in dire need of replacement and chose the pipe ramming process to facilitate the replacement with a 95' section of 60" casing at a 2% grade and 2 - 80' sections of 48" casing at a 1 % grade. The pipe ramming process has been successfully used to install steel casing for more than thirty years. When project specifications call for little to no soil displacement, pipe ramming is the cost effective alternative to other methods such as auger boring, open cutting, and micro-tunneling. Open cutting as simply not an option as the rail line could not suspend train activity on the line. The job site was located at the bottom of a 200' rock wall bluff with the tracks between the bluff wall and a river. Access to the site was limited to using the train tracks to get equipment in and out of the jobsite. In addition to these extreme conditions, the casings had to be installed through soil conditions that included rock (2' +/-) and cobble (8" +/-). All this had to be done without stopping the rail traffic that had as many as 56 trains moving through it a day. This paper will discuss the pipe ramming process and challenges related to the installation or replacement of culvert drainage pipes under railroad beds with a special focus on the project completed in Ardmore, Oklahoma for the Burlington Northern Santa Fe Railway Company.
机译:水是一种强大的力量。排水涵洞从需要保护侵蚀的区域直接水。在俄克拉荷马州Ardmore,伯灵顿北方Santa Fe Railway公司发现了三个失败的排水涵洞,这些抑郁症在急需替代品中,并选择了管道撞击过程,以便于替换为2%和2级的60英寸套管的95'部分。 - 80'部分48“套管为1%级。管道夯实过程已成功地安装钢外壳超过三十年。当项目规格呼叫几乎没有土壤位移时,管道撞击是其他方法的成本效果,如螺旋钻,开放和微隧道等其他方法。开放式切割根本不是一种选择,因为铁路线无法暂停线路上的列车活动。工作场所位于200英尺的岩石墙壁底部,带有小墙和河流之间的轨道。访问该网站仅限于使用火车轨道来获取工地内的设备。除了这些极端条件外,外壳还必须通过包括岩石(2'+/-)和鹅卵石(8“+/-)的土壤条件安装。所有这一切都必须在不停止具有如此的铁路交通多达56列火车每天都会搬运它。本文将讨论铁路床下安装或更换涵盖南方北方圣诞老人奥克兰·北方奥克兰·斯坦罗马群岛的项目的安装或更换涵洞排水管相关的管道撞击过程和挑战。 Fe Railway公司。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号